Loading...
2014-0611 Flynn Addition (Munson).pdf City of Edmonds PLAN REVIEW COMMENTS BUILDING DIVISION (425) 771-0220 DATE: July 17, 2014 TO: Randall J. Munson randy.munson@comcast.net FROM: Andrew Gahan, Plans Examiner RE: Plan Check: BLD2014-0189 Project: Coleman SFR th Project Address: 902 9 Avenue S During a review of the plans by the Building Division for the above noted project, it was found that the following information, clarifications, or changes are needed. A complete review cannot be performed until the revised plans/documents, including a written response indicating where the ‘clouded’ or otherwise highlighted changes can be found on the revised plans, have been submitted to a Permit Coordinator. Reviews by other divisions, such as Planning, Engineering, or Fire, may result in additional comments. General Note: 1.Clarify on the plans the means to be used to develop the required energy credits from the selected WSEC Table R406 options. The provided energy code compliance worksheet indicates that option ‘1a’ has been selected, while the window schedule indicates an incorrect U-factor and the floor insulation is improperly specified on sheets A-4 and A-5 to meet the requirements of option 1a. Additionally, it was indicated on the Building Permit Application Form A that the furnace will be replaced and/or relocated. If the furnace is to be replaced, the required energy credits could be obtained through option 3a, with the installation of a 95% efficiency furnace.