20140611165124964.pdfSURVEYORS m PLANNERS m ENGINEERS
June 10, 2014
City of Edmonds
121 5th Avenue North
Edmonds, WA 98020
13000 Highway 99 South e Everett, Washington 98204
-._. ... _......
_e
(425) 356-2 700 FAX (425) 356-2708
�� % ,�,, �, � � r II i
��� p;v la,o V � �
� r» dai,�i" r��/ �l�
IW I[Irli
G� 'l�l,,
Subject: 2" `1 SFR Planner Comment Response Letter, B1LDG20140247
Dear Mr. Kernen:
As you requested, this cover letter addresses your continents to the Duvey Building
Permit. Based on your comment letter dated June 10, we are addressing your comments
in order.
General
1) Site plan and drainage plan has been updated with correct lot sizes per recent
BLA plan. Impervious and Lot coverage calculations have been updated as well.
2) Aclaiowledged.
3) Building has been moved 0.5-feet south in order to achieve 7.5-foot setback
between edge of 2-foot cantilever and north property line. Note that due to
flatness of the site, the NW, SW and SE building corner elevations haven't been
effected by the building adjustment. The NE building corner envelope elevation
has been increased from 109.0 to 109.1.
If you have any questions about the revised drawings please call me.
Sincerely,
Western Engineers, Inc.
Jesse Jarrell, P.E.
Project Manager
. ....... 2�'lid
P �e—ivCORPORATION
1�=:EAR�ir�IEF . �