Judy Baratta and Thomas Pemberton 5/16/14
655 Maple Street
Edmonds, WA 98020
��O) H9W=31EM=T1'
III ig��g igppipll P.lip 11111 1
Contractor to supply material and labor to rebuild existing house using the same footprint
and same level of finishes — Note this proposal does not include the land
o $332,300.00
0 Lower level slab ® 6" to 8" thick
0 7' tall 8" think foundation wall (not including wall connecting to garage)
excavating and soil retention
0 Existing slab in garages
a Existing perimeter footings for garage -
0 Existing 6x6 Doug-Fir#1 posts
0 2 of the 3 existing 6x12 and 8x12 Doug -Fir #1 beams
0 Main Floor joists, rim boards ® 2x6 Doug -Fir #1
0 Main Floor sheathing
a South wall on the Main Floor
a Partial West wall on Main Floor
0 Partial East wall on Main Floor
® Associated fasteners and hardware are included
o Labor, material and Project Management for the above items:
® $93,100.00