Loading...
20140613120451388.pdfMACKE UfficV 14 9001 WOW, IVI Judy Baratta and Thomas Pemberton 5/16/14 655 Maple Street Edmonds, WA 98020 ��O) H9W=31EM=T1' III ig��g igppipll P.lip 11111 1 Contractor to supply material and labor to rebuild existing house using the same footprint and same level of finishes — Note this proposal does not include the land o $332,300.00 0 Lower level slab ® 6" to 8" thick 0 7' tall 8" think foundation wall (not including wall connecting to garage) excavating and soil retention 0 Existing slab in garages a Existing perimeter footings for garage - 0 Existing 6x6 Doug-Fir#1 posts 0 2 of the 3 existing 6x12 and 8x12 Doug -Fir #1 beams 0 Main Floor joists, rim boards ® 2x6 Doug -Fir #1 0 Main Floor sheathing a South wall on the Main Floor a Partial West wall on Main Floor 0 Partial East wall on Main Floor ® Associated fasteners and hardware are included o Labor, material and Project Management for the above items: ® $93,100.00 =111=41130TO1111- 6 - 1 . .201V Date (0 -- /2.- ?o ill Date Date www.hmacke.com Darrin@hmacke.com 206-396-8760