Loading...
20140619155400948.pdfJune 17, 2014 City of Edmonds 121 5t" Avenue North Edmonds, WA 98020 �j1 „"viii I'f F �e 991bIft UI, Oil I on°dtr " 4 ilwd ' Subject: 2'd SFR Engineering Comment Response Letter, BLDG20140247 Dear Ms. Zutauf: As you requested, this cover letter addresses your comments to the Duvey Building Permit. Based on your comment letter dated June 16, we are addressing your comments in order. General 1) Individual easements have been added, as opposed to a single easement, per LLA map. 2) You may be looking at the roof overhang over the driveway areas. Additional labels have been added to the map specifying edge of foundation and roof overhang. Hopefully that addresses your question. 3) Driveway has been revised to 10®foot width to access detached garage area. Plan 2:Utilities 1) Existing sewer stub note has been revised to 6" diameter 2) A new clean out has been added. 3) The approximate location of the existing side sewer cleanout has been added. 4) A clean out has been added on the side sewer midpoint along the east line of the south parcel. 5) Inverts have been revised for 2% min. 6) Length, material and size of water service line have been called out. Stor water: l) Slope between manhole and new catch basin has been revised to be under 20%. 2) Detail E 54- has been added. 3) A note has been added adjacent to catch basin detail. 4) Yard drain has been replaced. with a catch basin. 5) Swale detail along with culvert has been added to convey runoff from driveway swale into new detention system. LANDt �' I_ C. i_.. �..: � � �t.a ENGINEERING C,CiRG"ORATIC......... If you have any questions about the revised drawings please call me. Sincerely, Western Engineers, Inc. E: / 2013 / 131275 / Engineering / 2"" Engineering Coninient Response.doc ('411Y (V