Subject: 2'd SFR Engineering Comment Response Letter, BLDG20140247
Dear Ms. Zutauf:
As you requested, this cover letter addresses your comments to the Duvey Building
Permit. Based on your comment letter dated June 16, we are addressing your comments
in order.
General
1) Individual easements have been added, as opposed to a single easement, per LLA
map.
2) You may be looking at the roof overhang over the driveway areas. Additional
labels have been added to the map specifying edge of foundation and roof
overhang. Hopefully that addresses your question.
3) Driveway has been revised to 10®foot width to access detached garage area.
Plan 2:Utilities
1) Existing sewer stub note has been revised to 6" diameter
2) A new clean out has been added.
3) The approximate location of the existing side sewer cleanout has been added.
4) A clean out has been added on the side sewer midpoint along the east line of the
south parcel.
5) Inverts have been revised for 2% min.
6) Length, material and size of water service line have been called out.
Stor water:
l) Slope between manhole and new catch basin has been revised to be under 20%.
2) Detail E 54- has been added.
3) A note has been added adjacent to catch basin detail.
4) Yard drain has been replaced. with a catch basin.
5) Swale detail along with culvert has been added to convey runoff from driveway
swale into new detention system.
LANDt �' I_ C. i_.. �..: � � �t.a ENGINEERING C,CiRG"ORATIC.........
If you have any questions about the revised drawings please call me.
Sincerely,
Western Engineers, Inc.
E: / 2013 / 131275 / Engineering / 2"" Engineering Coninient Response.doc