Loading...
20140623144448561.pdf0 % DATE: TO: FROM: CitLof Edmonds PLAN RE, VIEW COMMENTS BUILDING DIVISION (425) 771-0220 June 19, 2014 Nancy Greenwood Vehrs Chuck Miller, Plans Examiner RE: Plan Check: BLD2014-0313 Project: Vehrs SFR Project Address: 1040 6"' Avenue S During a review of the plans by the Building Division for the above noted project, it was found that the following information, clarifications, or changes are needed. A complete review cannot be performed until the revised plans/documents, including a written response indicating where the `clouded' or otherwise highlighted changes can be found on the revised plans, have been submitted to a Permit Coordinator. Reviews by other divisions, such as Planning, Engineering, or Fire, may result in additional comments. On sheet 5: �, u 11 t2l, 11, Shearwall SAMW— MET red spacing of the 1 6d nails used for base plate 'requl' nailing of the 'SW1' and 'SW2' shearwalls. It appears to be greater than that required by the represented construction. /14RJ' holdowns at each end of the Foundation Plan — Clarify the callout for the 'ST14D 14 `SW4' shearwalls along the south wall of the garage and the north wall of the 'Master Bedroom'. Per the manufacturer they are unable to develop the tension loads noted in the provided structural calculations at those locations. On sheet 6: Roof Framing Plan Provide a detail on the plans, and a reference to it, for the required construction to transfer the lateral loads from the roof diaphragm to the top of the `SW1' shear wall along the north wall of 'Bedroorn 3. shear wall W Clarify the callout for the IMST48' strap tie at each end of the 'SWl' she along the north wall of 'Bedroom 3'. The referenced installation detail (12/7) does not appear to reflect the conditions represented in the provided construction d -OV ANN 5 documents. A pre-bent strap, similar to the ms,rC48B3' or equivalent, may be a suitable alternative, hAU) stoao ijlt ATV4. Upper Floor Framing Plan — Indicate on the plans the required connection at the b'ackspan to resist uplift at the 6x12 'look -out beams' used tosupport the roof over the main entry. In the provided structural cgiculations: /11 Clarify the length of the shearwall used in calculating the overturning forces at the south wall of the garage. The overturning forces appear to be based on a 13 foot shearwall width, whereas the plans indicate two shorter walls, which would result in overturning forces significantly greater than those noted. I gj= -� UAV �Ot(V (Its or.- (10 V, < 1* Mkov W"M 16, A Page 2 of 2