Loading...
2014-0651 Mosaic mechanical ductwork-exhaust - AllStar Htg.pdf City of Edmonds PLAN REVIEW COMMENTS BUILDING DIVISION (425) 771-0220 DATE: July 28, 2014 TO: Patrick Converse patrick@allstar-hvac.com FROM: Chuck Miller, Plans Examiner RE: Plan Check: BLD2014-0651 Project: Mosaic mechanical ductwork-exhaust th Project Address: 130 5 Avenue S During a review of the plans by the Building Division for the above noted project, it was found that the following information, clarifications, or changes are needed. A complete review cannot be performed until the revised plans/documents, including a written response indicating where the ‘clouded’ or otherwise highlighted changes can be found on the revised plans, have been submitted to a Permit Coordinator. Reviews by other divisions, such as Planning, Engineering, or Fire, may result in additional comments. On sheets 3 and 4: 1.Provide on the plans ventilation calculations indicating the required outdoor airflow rate to be supplied to each of the spaces per IMC 403.3. These should reflect the ‘people’ and ‘area’ outdoor airflow rates for ‘Beauty Salons’ as noted in IMC Table 403.3. 2.Indicate on the plans the capacity of each of the rooftop units providing the required mechanical ventilation per IMC 403. 3.Indicate on the plans the capacity of each of the ‘inline fans’ providing the required exhaust airflow rate for ‘Beauty Salons’ per IMC Table 403.3. 4.Indicate on the plans the means to be used to discharge any excess supply air per the pressure equalization requirements of IMC 501.4. Return air into, or transfer openings from, each of the spaces may be used to meet this requirement.