2014-0657 Port of Edmonds-Harbor Square mechanical - DK Systems.pdf
City of Edmonds
PLAN REVIEW COMMENTS
BUILDING DIVISION
(425) 771-0220
DATE: July 24, 2014
TO: D.K. Systems, Inc.
kevin@dksystemsinc.com
FROM: Chuck Miller, Plans Examiner
RE: Plan Check: BLD2014-0657
Project: Port of Edmonds/Harbor Square mechanical units
Project Address: 190 W Dayton Street
During a review of the plans by the Building Division for the above noted project, it was found that
the following information, clarifications, or changes are needed. A complete review cannot be
performed until the revised plans/documents, including a written response indicating where the
clouded or otherwise highlighted changes can be found on the revised plans, have been submitted
to a Permit Coordinator. Reviews by other divisions, such as Planning, Engineering, or Fire, may
result in additional comments.
On sheet 2:
1.Provide on the plans a detail, designed and stamped by an engineer, for the required
attachment of rooftop units 1, 2, 4, 6, 7, and 8 per IMC 301.15/17, IBC 1609/1613,
and ASCE 7-10 chapter 13.
In the provided equipment specifications:
2.Provide equipment performance information for rooftop units 1, 2, 4, 6, 7, and 8,
and outdoor heat pumps 1, 4, and 5, indicating compliance with the minimum
efficiency requirements of WSEC C403.2.3.