Loading...
2014-0693 Harbor Freight Revision #1.pdf City of Edmonds PLAN REVIEW COMMENTS BUILDING DIVISION (425) 771-0220 DATE: October 21, 2014 TO: Ely Antonio Sepulveda Email: ely@permitadvisors.com FROM: Leif Bjorback, Building Official RE: Plan Check: 2014-0693 Revision #1 Project: Harbor Freight Tools Project Address: 22111 Highway 99 During review of the plans for the above noted project, it was found that the following information, clarifications or changes are needed. Please provide written responses as to where the changes can be found on the plans, and submit revised plans/documents to a permit coordinator in the Development Services Department. Thank you. 1.Please provide a complete list of revisions included in this submittal. It appears that there have been more changes made to the plan set than we have been advised of. (Eg. On sheet M1.1 all existing RTU’s will now be changed out.) 2.Provide new anchorage calculations for the RTU’s (#1-#7) as the listed weight of the new units exceeds that used in the previous KPFF calculations dated August 15, 2014. 3.The City of Edmonds requires the use of 25 psf snow load for structural design. Please revise the KPFF calcs dated September 12, 2014 to reflect the 25 psf requirement. 4.The revised plan set appears to be a complete resubmittal with the exception of sheet P1.0A, which was not received. Please advise whether this sheet is intended to remain in the full plan set.