Loading...
20140714094517256.pdfOY EDi City of Edmonds O PLAN VI COMMENTS BUILDING DIVISION �st goo (425) 771-0220 DATE: July 8, 2014 TO: Todd Ritchey toddritcliey@ymail.com FROM: Chuck Miller, Plans Examiner RE: Plan Check: BLD2014-0559 Project: Parle remodel -addition Project Address: 7804 200`h Street SW During a review of the plans by the Building Division for the above noted project, it was found that the following information, clarifications, or changes are needed. A complete review cannot be performed until the revised plans/documents, including a written response indicating where the `clouded' or otherwise highlighted changes can be found on the revised plans, have been submitted to a Permit Coordinator. Reviews by other divisions, such as Planning, Engineering, or Fire, may result in additional comments. On sheet 2: 1. Floor Plan ire NotES a. Indicate on the plans the use of each of the spaces in the structure and note as APPeO To 3KT•2 `Existing' or `Proposed' as appropriate per the City of Edmonds `Residential Addition/Remodel/Alteration Permit Submittal Requirements'. Of particular interest Af,� '�� N&S. is the apparent second bathroom in the east portion of the structure. The Snohomish Agsr:5!5aF, riu5T County Assessor records indicate only one existing bathroom and no record of a �W Mt5se2 �K� CZ) F�TN Ms . permit to add another could be found. b. Indicate on the plans the required smoke alarms in each sleeping room and outside of -M :54i-r. Z each sleeping area in the immediate vicinity of the bedrooms per R314. gEENtrre.e, c. Indicate on the plans the required carbon monoxide alarms outside of each sleeping .SM. Z area in the immediate vicinity of the bedrooms per R314. On sheet 3: '55E VTL 2. Foundation Plan — Indicate on the plans the required footing width and depth per the AIVEP T® manufacturer to facilitate the embedment of the `PAB 7-30' anchorage for the `HHDQ14- 5HT' 3 SDS2.5' holddowns. Section A -A A F- �ms a. Indicate on the plans the proposed framing members to be used as `over framing'. Provide the size, grade, species, and spacing when specifying the member to be used. 4 SSE SEI Pore-$ b. Indicate on the plans the required framing member to be used to support the north end of the roof `over framing'. There appears to be a ridge beam supporting a SHT. 3 'g' • PP g PP g �s AppiTtbNAL- portion of the existing roof structure that will now be required to support a larger 5-rJZU6T. cJkLe—&- tributary area than before. Not enough information (size, grade, species, span(s), etc.) has been provided on the plans to verify its ability to support the additional loads. On sheet 4: ,;Zr-- NbTr= 4. Detail A — Typical Wall Section — Indicate on the plans the required fasteners, and their APMQ -rya spacing, for the attachment of the subfloor to the floor joists equivalent to Table R602.3(1). Ste. 4 5. Holddown Schedule a. Holddown #21 D6 T® i. Indicate on the plans the required species of the 4x to be used for the 5 4 attachment of the holddown to develop the load noted in the provided structural calculations. 5 GR"E ii. Clarify the callout for the epoxy to be used for the placement of the 00 5RT' `I' anchorage for the holddown. Simpson `Set' anchoring adhesive has not been shown to meet the requirements of AC308. b. Holddown #23 i. Indicate on the plans the required species of the 6x6 to be used for the attachment of the holddown to develop the load noted in the provided 5+17'' 4" structural calculations. ii. Clarify the callout for the dimensions of the required footing to develop the tension load noted in the provided structural calculations for the `PAB 7-30' 00 sRr' anchorage. While the embedment depth into the footing seems more than sufficient, the 24 inch width appears to be less than that required per the manufacturer. On sheet 5: 51rE 6SMaE6. General Notes — Framing — In the last note, starting with "Shear nailing and lateral...", °�T S change the code version from `2006' to `2012'. 7. Washington State Energy Code Notes a. " Insulation SHT. S 1' —Note #6 —Clarify the table reference for the installation of `heeled � ►-E trusses'. There is no `Table 6-in the 2012 WSEC. �N 5E1T. gE� GHAtV-e b. Other Energy Notes — Note #1 — Change the wording for the installation of high n N saa e . S efficacy lamps in permanently installed lighting fixtures to that of WSEC R404.1. Xe 4OM&t c. Air Sealing — Note #6 — Change the code section for the required building envelope 00 S"T. S leakage testing from `502.4.5' to `402.4.1.2'. Page 2 of 2