20140728164438371.pdfUU&ASSOCIATES, INC.
Geotechnical Engineering Engineering Geology Earth Science
July 18, 2014,
Mi% Jima Henricks
336 Sunset Avenue
Edmonds,'WA 98020
Dear Mr. Henricks:
Subject: Critical Area and Geotechnical Report
Single-faudly Residences
,3,3,6 and 340 Sunset Avenue
Edmonds, Washington
L Job No. 14-04 t
Regarding the corntnent in City of Edmonds 4/9/2014 review letter by Mr. Clugston, we
have the following responses:
23.40.090 - CRITICAL AREAS REPORT
D. I
Applicant: Mr. Jirn Henricks, 336 Sunset Avenue, Edmonds, WA 99020.
UEN
a, Site Plan — Plate 1. attached (covering both properties). A single-farnily residence
is being or to be developed on each property,
b, Storm Water Management Marr Storm runoff collected over impervious surfaces
of both residences is to be discharged directly into city's steam sewer system per
design plans,
19213 Keliflake Place NE - Kenmore, Washington 98028
Phone (426) 483-9134 - Fax (425) 486--2746
C�rJuly 18, 2014
itical Area / G'cotechnical Report --- TwoSingle-Farnily Residences
L&A Job No. 14-041
Page 2
IM
Report prepared by: L S. Liu, geotechnical engineer, PE, with Liu & Associates, Inc.
Report prepared based on review of a ptiblished geologic rnap, a site reconnaissance, and
soil condition encountered in a utility trench excavated on the east property (336) on
which a residence is currently being constructed.
DA — Geologic Hazard Identified.
According to City of Edmonds Critical Areas Map, the western portion of the subJect
pro.ject site is mapped in seismic hazard areas.
D.5 -- The pro.ject sites are flat tovery- gently slope(]. The soils underlying the site are not
prone to liquefaction. Therefore, seismic hazard, stieb as landslide, soil lateral spreading,
liquefaction, for the sites is minimal and no mitigation is required (See Geotechnical
Investigation report under 23.40.120 below).
D.6 — No mitigation is required.
23.40.090 — MITIGATION REQUIREMEN'T'S
GE077ECHNICAL INVESTIGAT ION' REPORT
The two properties sit side by side in an east -west direction, The topo),),raphy survey plan
with 2-I`(,)ot contour lines (see Plate 1) shows the properties are almost flat with a
maximirtn 9 Ibet of drop Iron) its northeast coverer to its southwest corner over a
horizontal distance of about 220 feet, The terrain within these properties generally slopes
LJU &ASSOCIATES, INC.
July 18, 2014,
Critical Area / (1cotechnical Report -- Two Single-Fainily Residences
L&A Jot) No. 14-041
Page 3
down 'very gently westward at in overall average grade of about 4,5% across the
properties. The properties and their surrounding areas within 200 JIM to the north, south,
and east, and the street fronting them to the west, are all either flat or very gently sloped.
A single-family residence is currently being or to be developed oil each of the two
properties. The unpaved area open areas on these properties will mostly be covered by
lawn grass and shrubs.
Geologic Setting
The Geolo 'ie i alb of the E'drnonds East and Part of 'the Ednionds West , qL41r,,tt e,
Wqsbjngq)jj, by Jarnes P. Minard, published by U. S. Geological Survey in 1983, was
referenced for the geologic and soil conditions of the properties. The surficial soil unit at
and in the vicinity of the properties is mapped as Whidbey formation (Qw) by this
publication,
The Whidbey formation soil unit on which the properties lie, consists of pre -Fraser
Glaciation sediments composed of glacial and non -glacial flood -plain deposits of light -
brown to gray, fine sand with silt, minor amount of clay, and occasional gravel and
organics, These Whidbey formation deposits, generally underlying thin layers of topsoil
and weathered soil, are normally very -stiff to hard in their native undisturbed state. They
are also of extremely lo%v permeability and tend to perch storinwater infiltrating into the
overlying more permeable surficial soils. The perched groundwater rnay ernerge out of
natural slopes and man-made cuts where the Whidbey formation is exposed. When the
amount of groundwater seepage increases in wet winter nionths, the emerging
groundwater can erode and cause the soil mass in an(,] above the seepage zone to erode
1,11) & ASSOCIATES, INC.
July 18, 2014
Critical Area / Geotechnical Report,--- Two Single-1,'arnily Residences
L&A Job No, 14-041
Page 4
and slough. The ground within the properties, however, is very gently sloped and,
therefore, the possibility for groundwater seepage to occur within the properties stiould be
ratherunlikely.
A. sewer line trench has been excavated along the south side of the east property. This
trench encountered a thin layer of top soil and a layer of weathered soil of light -brown,
inedium-dense, gravelly, silty, fine sand. This layer of weathered soil is underlain to the
bottom of the trench by a light -brown to fight -gray deposit of hard, fine -sandy to clay silt,
which appears to be of Whidbey forniation. This soil condiliori is comparable with our
experience of the soil condition in the ininiediate vicinity of the su�jcct properties.
Groundwater Condition
The sewer line trench did riot encountered groundwater. However, perched groundwater
may exist on top of 'the underlying Whidbey formation of extremely low perineability.
This perched groundwater is from storinwater infiltrating into the more permeable
surficial soils. The arriount of and the depth to the Dez'u,-surfitcc perched groundwater
would flrnCtUatC seasonally, depending on precipitation, stirl"ace rirnoft'l ground vegetation
cover, site utilization, and other fiactors. The near -surface perched groundwater may dry
tip cornpletely during the dryer summer and fall months and accumulate and rise in the
wet winter and early spring months.
Seismic Hazard Evaluation
The west fi-inge of the properties is rnapped by City of Edmonds in seismic hazard areas.
Seismic hazards include rupture of fault, lines, soil liqUCfi1Cti0D, lateral soil spreading, and
landslide, "t"he properties are flat, to very -gently sloped; therefore, the potential for lateral
L,JU & ASSO(""IXTES, INC.
July 18, 2014
Critical Area / Geotechnical Report - Two Single -14 amily lkesidences
L.&A Job No, 14-041
Pagc 5
soil spreading and landslide to occur oil the properties should be minimal, The properties
are not in close proxiniity of known fai.ilt lines; therefore, their hazard firorn fhult line
rupture should also be minirnal.
11(luefiaction is another form or seismic hazard. The type of soils most susceptible to
liquet.'action during a strong earthquake is saturated, loose, thle sand to silty fine sand
deposits. Such loose fine-grained deposits, when suhiected to strong ground shaking, can
be densifted and decrease in volume. If water in the deposits is unable to drain quickly,
pore water presstire in the deposits would increase. When the pore water pressure
continues to build up by prolonged ground shaking, a "quick" corWition will be reached
when the pore water pressure equals the effiective overburden soil pressure at some depths
in the deposits. Under this condition, the sand deposits would turn into a liquid state and
lose its load bearing capacity. ",ate Whidbey formation deposits of had fine -sandy to
clayey silt underlying the properties at shallow depth are of high cohesion and shear
strength. They are not susceptible to decrease in volume during
ground shaking from
strong seismic activities. Also, there is a lack of" constant and extensive groundwater
table under the properties at shallow depth. Therefore, the chane for pore water pressure
in these soils to build up and lead to Soil li(IlletactiOD is Ili]. Therefore, in our opinion, the
liquefaction hazard of the properties should also be rninirnat
Based on the above analysis, we concluded that:
A— No constructior) activities ftonl development wotild degrade critical areas,
B —bier requirement specific to critical area type is need( -A.
LIU & ASSOCIATES, IN(11.
July 19, 2014
Critical Area / Geotechriical Repor(--Two Single -Family Residences
IAA Job No. 14-041
Page 6
1. No construction activities firom development would degrade critical areas,
2, No steps would be necessary to jrfinimize inrpact on critical areas.
3. No rectiyin g measures are required,
4. No restoring or stabilizing actions require(],
5. No special preservation or maintenance measures required.
6, No compensating measures required.
7. No inonitoring prograerrs required.
We are pleased to be of service tca you or) this project. Please contact us if you have
questions.
Attaclied: Plate I --, Site Plan
Yout,s very truly,
1,11 L& 3SOCIA",",IES", INC.
J. & (Julia,n) Liu, Pb.D., PE
Consultijig ("Icoteclinical, E'rigineer
L & A.SSOC'I.,A"'I"I4,IINC.
("14,
3 .0VflZJC N
3 AKMW N . .....
1 , [ " k
Pw
A�§' 'aJ
Ilk. ... ....... .
.
(4) vull �tv
I
s.
SAO
'""y A AM
�'� �11.
WK
L
WW AT&
1
m
C1181om
MIAMI 4
aa, Pool
z
jj 4, N
1P, it
5.`�' Zy
ou 1 � 11� 'I, � & � ", "I
,/A,, -Z , -- �";/
. .... ...... ..
.... ...... . . . .. ... ....... . . .. . . . .. ..... . .
ca
I N 0 r1 A V J. -:1 N ("I s
re
0>
EPM
J.
Ing
0>
EPM
J.