Loading...
2014-0742 Krohn Solar PV.pdf City of Edmonds PLAN REVIEW COMMENTS BUILDING DIVISION (425) 771-0220 DATE: August 11, 2014 TO: Jon Lange Email: JonL@Sunergysystems.com FROM: Leif Bjorback, Building Official RE: Plan Check: 2014-0742 Project: Krohn PV System th Project Address: 21112 80 Place W During review of the plans for the above noted project, it was found that the following information, clarifications or changes are needed. Please provide written responses as to where the changes can be found on the plans, and submit revised plans/documents to a permit coordinator in the Development Services Department. Thank you. 1.Please provide a cost breakdown for the project. The permit fee for commercial and multifamily projects is based on the valuation of the project excluding the cost of the panels and inverters. 2.Please provide a roof framing plan and either: a.Structural calculations by a WA state licensed engineer or other competent person showing the adequacy of the existing roof structure to support the additional load, or b.Documentation showing that the roof structure was substantially overbuilt compared to prescriptive code requirements.