20140808171025038.pdfMEN Ah
wwomom
MR. CHRIS RIVERA
ENGINEERING
CITY OF EDMONDS
RE: JANTZ TENANT IMPROVEMENT
BLD20140634
ITEM #I SEE SHEET A-1
ITEM #2 NO CATCH BASINS WITHIN PROJECT VICINITY
ITEM 93 SEE ATTACHED
ITEM #4 SEE SHEET A-3
ITEM #4a THERE WILL BE NO RE-ROUTING
ITEM #4b SEE ATTACHED
ITEM #4c THE SYSTEM SHALL NOT BE AFFECTED
ITEM #5 SEE SITE PLAN (A-1)
ITEM 46 ALL STAGING WILL BE INTERNAL
ITEM #7 PERMIT NOT NEEDED — LOADING AND UNLOADING WILL BE INTERIOR.
ITEM #8 THERE WILL BE NO LOADING OR UNLOADING WITHIN THE RIGHT OF WAY.
SINCERELY,
WARREN LA FON
W A F� R E NJ A F� 0 N - A Fl, C i 1 i r 8/49 P(JGE � VVAIr" [: D M () 1`4 W A �),R 0 2 0 42�i VI 4 () fi,80
OEM Ah
wwmmmm
WARREN �AFON
A R C H I E c V
A idc ii I r I `I LVf7 ti,:
, 1111 1 1 RIOR�i
IN,
560 PARADI IM o, WA 98020 /714-05BO
MR. CHRIS RIVERA
CITY OF EDMONDS
RE: BLD 20140634 ITEM 4 (B)
WITH THE REMOVAL OF THE PAR -KING THE MAINTENANCE IS NOT AN ISSUE. THE
SYSTEM SHALL BE RETAINED BUT IS NOT NEEDED FOR THIS PROPERTY.
SINCERELY,
ri JAV