20140812132617871.pdfJuly 29, 2014 CARLETTI ARCHITECTS, P.S. architecture, interior design & planning Jeanie McConnell Engineering Program Manager City of Edmonds , 121 5th Avenue North Edmonds WA, 98020 Reference: Plan Review Continents Plan Check 9 2014-0457 Prestige Care and Rehabilitation of Edmonds Skilled Nursing Facility 2100876 1h Ave. W Edmonds, WA 98026 Dear Ms. McConnell: The following is in response to your correction checklist dated July 16, 2014 (revised). Please find listed below our itemized responses: GENERAL 1. Please provide an itemized engineers cost estimate, including units and unit prices, for both on- site and off-site (right-of-way) improvements, including traffic control. Please utilize the King County Site Improvement Bond Quantity Worksheet to complete the estimate. o A bond is required to be placed for all right-of-way improvements. The amount of the bond will be based on 120% of the City approved estimate for all right-of-way improvements. The City will inform you of the appropriate bond amount after review of the cost estimate. Bond forms can be obtained from Permit Coordinators Linda Thornquist or Kristin Johns at 425- 771-0220 or by email at linida.thornquist@edmondswa.gov or 1,,'-i-istin.j'ohns@edmondswa.gov o Inspection fees for this project will be calculated at 3.3% of the 120% City approved estimate for all improvements. RESPONSE: Please see attached an itemized e)7-i17eers cost estimate, includirng units and tmit prices, for both on-site (right -of �vay) improvements, including traffic control. The King County Site Improvement Bond Quantity Worksheet has been used to complete the, estimate. 2. Please include a City of Edmonds Engineering approval block on each plan sheet. A sample approval block can be found on the City website or through this link. RESPONSE: The City ofEdnimids Enlgineering approval block has been included on all civil plan sheets t)rpical. S:\Arc17\13\13 Documents\13-625 Presitge Care\City\Setrt\7 16-14 PW Correction Letter\13-625 PW Civil Correction Response Letter'7-29-1.4.docx 116 E. FirStreet, Suite A Mount Vernon, WA 98273 (360) 424-0394 FAX (360) 424-5726 Jeanie McConnell Jul), 16, 2014 Page 2 of 10 3. Show all dry utilities, including vaults, and required utility separation. Please add a note that a minimum of 3' separation is required between the dry utilities (power, gas, phone, cable, etc.) and sewer, water, and storm and 5' from any City main lines. RESPONSE: Layers added to civil plans. Note added to C3.1 plan sheet. 4. Provide a Construction Sequence similar to that found on the City website or through this link. RESPONSE: Added to C 1.1 Sheet 5. Truncated domes will not be required along property frontage. Please revise plan sheets accordingly. RESPONSE: Truncated domes removed 6. Include painted centerline of 76th Ave W. on plans. RE SPONSE: Added to plans. The following comments are from Jerry Shuster, Stormwater Engineer, and were emailed to CG Engineering on July 1, 2014. Please contact Jerry directly at 425-771- 0220 or by email at jerry.shustei-Ca),edmondsiva.gov with any specific questions you may have regarding these comments. 1. Section 1, second from the last paragraph — Include that this site qualifies as a Large Site Project per ECDC Chapter 18.30. RESPONSE: Added to report where indicated. 2. Section 3 — This section properly lists the minimum requirements applicable to the project. The reviewer could not find discussions on how the project complies with minimum requirement #3 (Source Control of Polltion) and minimum, requirement #8 (Wetland Protection). Please include. I RESPONSE: The site does not discharge directly or indirectly into a wetland., so i-niniMMI-1 requirement #8 does not appear to be applicable. This is discussed in Chapter 4 of the report, Source Control is discussed in Chapter 6. 3. Section 5, A & B — Indicate that based on the geotechnical study, the site will be modeled in WWHM using Type C soils. RESPONSE: Added to noted parts of report. CARLEM ARCHITECTS, P.S. Jeanie McConnell July 16, 2014 Page 3 of 10 4. Section 5, C & E — The site is located within the Halls Creels drainage basin, making part of the Greater Lake Ballinger Watershed (Edmonds StormlVater Code Supplement [ESCS] page 51). Consequently per ESCS Section 5.6.2.2, phosphorus treatment of the runoff from the pollution generating impervious surface is required. The designer can choose from those treatment technologies in the 2005 or 2012 Ecology Storinwater Management Manual for Western Rashington or the phosphorus treatment technologies approved by Ecology with a General Use Level designation (http://www.ecy.wa.yov/programs/wq/stormwater/newtech/teclu-iolovies.html). The most common of these technologies used in Edmonds are the Mistar Flogard Perls Filter (low head requirement) and the Americast Filterra units (Note: the City is not endorsing the use of these products, just providing some potential options that will meet the regulatory requirements.). The same "pretreatment" requirements apply to these'technologies that apply to the Contech stormfrlters that are included in the current design. RESPONSE: Perls Filters by Kristar have been implemented into the design in }dace of the Storrmilters. Section 5E — Include the WWHM reports for sizing the water quality treatment system. RESPONSE: Added to report. 6. Section 5F— Show that the riser. pipe that is part of the detention system control structure can handle the 100 year un -detained flow (1.16 cfs). A SPONSE: Discussion of the overflow capacity added to this section. 7. Section 6 — Since the site is classifies as a Large Site project, it is subject to the requirements in Appendix I of the City's stormwater discharge permit with Ecology. While most of the requirements have been addressed, the City requires the applicant fill out the Permit Appendix 7 (Construction Site Sediment Damage Potential Worksheet, enclosed). This form helps the City's inspectors plan for the frequency of inspection during construction. Please include a filled out worksheet in the report. RESPONSE: This worksheet is added to Section 6. It does not appear that any of the -erosion sensitive features denoted in Step 1 are applicable. If none of these features apply, Step 1. indicates the assessment to be complete. Plan Sheets 8. Sheet C3.1 CBs 6 and S (water quality treatment) should reference details on the configuration of the treatment system (usually the manufacturer's detail for the specified .products(s)) RESPONSE: Details added (Sheet C3.3) CARLETTI ARCHITECTS, P.S. Jeanie McConnell Jidy 16, 2014 Page 4 of 10 9. Sheet C3.2, Detail 3 — The City has changed its standard for a flow control structure eliminating the shear gates. See standard detail 5.4 (http://www,edmondswa.gov/imaf4es/COE/Services/Periilits and Development/Standard De tails/Storm Drainage/E5-4 FLOW CONTROL STRUCTURE.pdf ). An AutoCad version is available upon request. Note that either a v -notch or a rectangular notch is permitted. RESPONSE: Added to C3.3. Detail 3/C3.2 has been left in the plan set to convey design information for this specific project, although we. have removed the shear gate and updated dimensions accordingly. STORMWATER VAULT — STRUCTURAL PEER REVIEW 1. Peer Review of the structural design for the detention vault was competed by David Evans and Associates. Comments from, DEA were provided to CG Engineering on June 19, 2014. Please address comments accordingly. RESPONSE: Comments addressed in separate response letter. AM — SITE PLAN 1. Please revise the site plan so as not to include specific notes related to civil construction plan improvements. A note should be added to the Site Plan that states "Refer to Civil Construction Plans for site development requirements." RESPONSE: A note has been added on site plan sheet A 1.1 that states "Refer to Civil. Construction Plans for site development requirements. L-1 PLANTING PLAN 1. A generator on a concrete pad with CMU wall is shown near the SE comer of the property. Plantings have been shown over the top of this structure. Please revise. RESPONSE: The landscape plan sheet L- I has been adj Listed to show the Generator on a concrete pad Nvith CMU wall on the SE corner of the property. 2. Please show trees along property frontage and at the building with 5 -foot separation from utilities. RESPONSE: Trees have been shoNvn along the property frontage and at the building with. 5 foot separation from utilities. IR -1 IRRIGATION PLAN 1. Please include an Irrigation Note that states "A separate irrigation permit must be obtained from the City Public Works, Department. Prior to final acceptance provide the City Cross -Connection Control Specialist with a copy of the backflow test report. Test reports can be faxed to 425.744.6057 or e-mailed to linda.mcmurpjiv awedmondswa.gov Backflow testing will be required on an annual basis thereafter." CARLE-iji ARCHITECTS, P.S. Jeanie -McConnell July 16, 2014 Page 5 of 10 RE SPONSE: On sheet IR -1 irrigation plan a note has been added that states, "A separate irritiation permit must be obtaineditorn the City Public 147orks Dgmronerrt. Prior to final crcceptcn?ce Provide the City Cross -Connection Control Specialist frith a copy ofthe bac4lora test report. fest reports can be faxed to 475. i44.F057 or e�-moiled to linda.mcmr�rt�h�- a eclrttorads���a. Ov Backl1o��v testing ia,ill be required on an crnnuol bosis thereafter. SHEET CLI — COVER SKEET ANIS GENERAL, NOTES 1. Please list utility purveyor contact info for all utilities including water, sewer, storm (City of Edmonds), Fire (Fine District 1) and all dry utilities — power, phone, gas, cable. SPONSE: This information has been added to the plans. 2. Revise General Notes #1 to reference 2014 WSDOT standard specs. RESPONSE: Note updated. SHEET C2.1— TEMPORARY EROSION CONTROL, PLAN 1. A sediment trap can be constructed with an overflow piped to the storm system; however, the plans show an overflow spillway that will overflow across the public sidewalk. Please revise plans accordingly. RESPONSE: Overflow changed to a riser pipe. 2. Please revise the leader for the filter fabric fence so it points to the correct line. It currently points to the property line. SPONSE: Revised. 3. Add notes that the existing sidewalk is to be removed and replaced and reference Sheet C5.1.. SPONSE: Note added. 4. Add notes that the existing curb and gutter shall be removed and replaced in areas of replaced driveway approaches and as determined by the Engineering inspector. RESPONSE: Note added. 5. This project is in a high pedestrian location. Please add notes that existing sidewalk shall be maintained until removal and immediate replacement is planned. Temporary patches for utility cuts/connections should be with asphalt. SPONSE: Note added. CARLETTI ARCHITECTS, P.S. Jeanie McConnell July 16, 2014 Page 6 of 10 6. Add notes in the location of the proposed construction entrance that the existing asphalt driveway approach (and any on site asphalt) shall be maintained as long as possible during construction. RESPONSE: Note added. 7. Where existing water meter is to be removed and service abandoned, add a note that the service shall be cut and capped at the water main. A SPONSE: Note added. Show existing fire line frons water main to the DCVA. The fire line will also need to be cut and capped at the water main. RESPONSE: Note added. Fire line shown as indicated. 9. Show location of existing sanitary sewer line. Is there any intent to use the existing sewer lateral? If so, the condition of the lateral will need to be TV'd by the City Public Works Department to determine its condition and if it's acceptable to reuse. If it not acceptable to reuse or if the intent with the proposed design is to run a new lateral, then the existing lateral shall either be cut and capped,at the property line or chased back to the mainline. Please add notes to the plans accordingly. RESPONSE: Location of existing seNver shown (as much as is known). We are not Planning. to reuse this line. 10. The trash enclosure area is not shown consistent on this plan sheet. Please revise. + SPONSE: This sheet shows the existijig trash enclosure area. A note has been added,to indicate this. The rock check dam detail provides Sections A -A and B -B. Please indicate where these cross sections are taken from. RESPONSE: Section cuts added to C2.1 plan. SHEET CM — PRELIMINARY GRADING AND DRAINAGE PIAN 1. Please remove the word "preliminary" from the sheet title. RESPONSE: Removed CARLETTI ARCHITECTS, P.S. Jeanie McCon'77ell July 16, 2014 Page 7 of 10 2. The trash enclosure should have a concrete slab surface. Drop pins/pavement sleeves shall be provided for securing gate sections in both open and closed positions. RESPONSE: Concrete surface provided. Please reference I I/A1.2 for drop pin, pavement sleeve locations. 3. Please reference plan sheet in which trash enclosure is provided. RESPONSE: 11/A1.2 referenced in call out. 4. The storm main crossing in 76t" Ave W shall be perpendicular to the main line. Please relocate the storm structure in the 76"' Ave flow line accordingly. RESPONSE: Per our email discussion we are leaving, the line as shown. It replaces an existing storm inain, albeit at a greater depth, Perpendicular crossing would create a conflict with the sewer line. 5. Please revise catch basin schedule as follows: (3) This basin flows to (4), but has an i.e. lower than inlet at (4). Please revise accordingly. (6) Please provide South i.e. RESPONSE: RcN7iSiojjS inadc as noted. 1. Please remove the word "preliminary" from the sheet title. RESPONSE: Removed. 2. Please revise detail 5 to indicate max slope of finished grade on the back side of the retaining wall. The plans indicate plantings in this area. RESPONSE: Maximum slope added to detail. SHEET C4.1 — WATER AND SEWER PLAN 1. The gas service is shown to cross the sewer line near the grease interceptor twice. Please show the new gas service rerouted around the sewer system entirely. RESPONSE: Gas service adjusted to dodge sewer. 2. Domestic water meter shall be shown in the ROW at the property line. RESPONSE: Domestic water inctcr per Cit-,,, Standard Detail 7.6.2 installed at propci-ty line. CARi-E-rii ARCHITECTS, F.S. Jeanie McConnell July 16, 2014 Page 8 of 10 3. The tap off the domestic service for irrigation shall occur on private property. Please revise plans accordingly, SPONSE: Plans revised to show tap ori private property 4. Please clarify what is meant by "future phases" in the note that states "2" domestic service w/ 2" meter (to be sized in future phases) per ....) RESPONSE: This line has been sized and the note is removed. 5. Show existing domestic and fire line comlections at the main that are to be abandoned. The trench shall be expanded to include this work. RESPONSE: Trench expanded, lines shown, note added. 6. A 6" inline valve shall be shown on the fire line near the City main connection. RESPONSE: Crate Valve added. 7. Please move the fire line connection closure to the domestic service connection. Moving this line further to the south would also eliminate the need for a bend at the building.. SPONSE: Fire line had to be moved farther apart due to added vaults, utility separations. etc. 8. The plans currently show two existing inline valves in 76th Ave W near 210t" Street SW. These valves do not exist as inline valves. Please remove from plans. The City's PW Operations group has indicated a very large area would be affected by a water main shutdown. Instead of installing a valve cluster with the fire line connection to the City main, an EZ -valve. 2 inline valve insertion may be required. Staff is currently discussing this and will follow-up with you soon. SPONSE: EZ -2 valve added as directed. 9. In addition, when a building is setback from the ROW by more than 10 -feet a vault for the fnreline DCDVA is typically required. Staff is also discussing this issue and will follow-up With you. SPONSE: DCDA added. 10. An i.e. in the NW direction is shown for the existing sewer manhole in 76"' Ave W, but the line is not shown. Please clarify. RESPONSE: This � as the existing stub from (lie Prestige Care buildizrg. 11. Reference and include in plan set City standard detail for SSMH. The existing manhole in 76th will need to be rechan neled with the new cormection. CARLETTI ARCHITECTS, P.S. Jeanie McConnell July 16, 2014 Page 9 of 10, RESPONSE: Added to C4.1 12. Show/callout the sewer cleanout required at the property line on the 8" lateral, RESPONSE: Cleanout added. 13. Please revise the GI line to a 6" minimum diameter. RE SPONSE: GI line diameter updated. 14. Plans refer to existing irrigation service, meter and check vault. The City Operations Dept has indicated the site does not have an existing service. Please clarify. RESPONSE: Service leas been updated to show proposed irrigation infrastructure. 1. Replace detail E7.10 with E7.11 to show required RPBA in a hotbox. RESPONSE: Detail replaced. 2. The rock check dam detail provides Sections A -A and B -B. Please indicate where these cross sections are taken from. I R14ESPONSE: Sections added to C2.1 Plan. SHEET C5.1 — ST'REE'T' IMPROVEMENT PLAN AND DETAILS 1. Please submit a traffic control plan for all phases of work in 76t Ave W. TCP will need to reflect the actual number of travel lanes and state specific working hours so as not to conflict with peak school traffic in the area. Please also provide a haul route plan for review and approval. RESPONSE: C5.2 Shect added to depict traffic control. Five different worlt zones are depicted and standard details froj)i the N4UT'CD are provided accordingly. Notes added to reflect S'pecilic working hours, Haul Route plan to 1-5 added to plan sheet. 2. To provide clarity in how construction activities will disrupt traffic, please show travel lanes and painted center line. RESPONSE: Travel lanes and center Iiiie added 3. Clearly identify paving restoration limits. At a minimum the water and sewer utility patching shall be incorporated into one solid patch. The storin system will likely need to be incorporated into this patch as well. As currently shown, the storm trench would require a half -width or more overlay. CARLET-H ARCHITECTS, P.S. Jeanie McConnell July 16, 2014 Page 10 of 10 RESPONSE: Plans updated. Patches shoNNu for utilities ori flicir applicable sheets. All patches shoNN7ii on C5.1. 4. Replace standard detail E2.10 — Vertical Curb with E2.8 — Curb and gutter. RESPONSE: Detail replaced. 5. Truncated domes are not required at driveway entrances. Please remove from plans. RESPONSE: Truncated domes removed. 6. Please add a north arrow to the sidewalk closure plan and label streets. RE, SPONSE: We have left this detail as is, but ShoNvIl the barricades and pedestriaii route on the traffic control plan., Nvhere street names and north arrow are shown. 7. Include City standard detail E4.2 — Trench detail — in plan set. RESPONSE: Added to C3.3 If you have any questions, please don't hesitate to call me. Sincerely,, .. .... w_ ..... David Wilson Carletti Architects, P.S. Cc: TJ Mellama — Exxel Pacific (Contractor) Peter Carletti — Carletti Architects (Architect) Paul Rasmussen — Prestige Care, Inc. (Owner Contact) April Copeland — Prestige Care, Inc. (Owner Contact) Jared Underbrink — CG Engineering (Civil) Attachments: - Site and ROW Improvement Bond Estimate Updated Drawings Re -Submitted. (D sets 24 x 36 -(3) Two hardcopies of 24 x 36 updated complete sets of Civil, Architectural, Structural, Mechanical (HVAC)/ Plumbing, Electrical, Kitchen, and Landscape Plans. Note: Plan sheets that have revisions are clouded and marked with revision triangle #2 and the Revision section on the title block of adjusted sheets are labeled "City Rev./ Bid Set 8-4-14 " with Revision Triangle #2 CARLE-rri ARCHITECTS, P.S.