20140813091600462.pdfENGINEERNNG July 14, 2014 Jeanie McConnell City of Edmonds 121 5th Avenue North Edmonds, WAV803O-3l45 RE: Permit: 2014{457 Project Name: Prestige Care Detention Vault Review Dear Ms. McConnell, itemized below bour response tothe detention vault plan review comments submitted on June 18, 2014 for the above referenced project. Our response appears in bold. SVI.1 1. Add "ACI 350-06 Code Requirements for Environmental Engineering Concrete Structures (ACI 350-06)". This code governs the design of environmental engineering structures including detention vaults. Vault has been redesigned to ACI 350-06. Please refer torevised drawings and additional calculations. 2. 250 PSF per geotechnical memorandum, Update here in calculations. The 250psf live load surcharge is a vertical load. Page 15 of the geotechnical report states "For traffic loads, we recommend using an equivalent two foot soil surcharge, of about 250 psf". A 2ft surcharge of 50pcf soil was added resulting in a lateral load of 3. Recommend defining maximum distance between construction joints rather than a plan are. Also, ACI 350 minimum shrinkage and temperature reinforcement requirements Table 7.l2.21are based off length between movement joints. Control joint note revised to 20ft maximum. Refer to revised notes sheet. SV2.1 1. Recommend providing vault elevation. Also nolid elevations provided. Lid elevations added to2/SV2.1. Top of slab elevations are included mn I/SV2.1. ImKet Prestige Care -13073.10 July 14, 2014 Detention Vault Comment Response Page 2 of 3 SV3.1 1. Provide hydrophyllic water stop as this joint will crack. Waterstops have been provided at cold joints. 2. No interface shear calculation included. Will probably have sufficient interface shear capacity but may not meet minimum interface shear reinforcement requirements. Interface shear adequate. Refer to the attached interface shear calculation. 3. Check minimum reinforcement requirement in ACI 350-06 Table 7.12.2.1 and minimum cover requirements in ACI 350-06-7.7.1. Both of these requirements are more stringent that ACI 318 to reduce cracking in the structure. This applies to both walls and footing. Wall design revised per ACI 350. Refer to the attached reinforcement calculations. 4. Reinforcement is not fully developed her. Typical in multiple locations. Also, insufficient reinforcement to resist diagonal shear crack. Development length has been calculated and the reinforcement has been revised to include a hook. Top reinforcement has also been provided to resist shear crack. S. Strongly recommend a double mat of steel in walls, This is desirable for walls and slabs in a detention vault to prevent cracking and remain water tight (especially in this case where walls/slab are 8" thick or more). Vault has been redesigned to ACI 350 which does not require 2 layers of reinforcement for walls 10" or less. Vault walls have been updated for requirements of ACI 350. Refer to the attached calculations and revised details. 6. Wall - Examine case of water in vault with loss of backfill. Will cause tension on outside of the wall and may require another mat of steel. Wall has been analyzed per load combinations in ACI 350. In the load case where the vault is full of water the resisting soil has been reduced to 0.611-11 per the ACI 350 9.2.1 (d). A load case where the vault is full and the soil is not present is not required by code. 7. Slab- Examine case of empty vault where self weight of vault above slab, fill above vault, and live load will cause tension in top of slab. May require an additional mat Additional reinforcement added to footing. Refer to revised details. 250 4th Ave S Edmonds, WA 98020 p. 425.778.8500 f. 425.778.5536 IUC5INRIhIG Prestige Care 1]07]10 Detention Vault Comment Response Calculations Page July 14,014 Page 3of3 The 25Opoflive load surcharge ismvertical load. Page 16ofthe geotechnical report states "For traffic loads, werecommend using anequivalent two foot soil surcharge ofabout 25011 A2ftsurcharge of SOpdsoil was added resulting |nalateral load of1ODpsf. Page An additional load case has been provided with water at the exterior and no water inside the vault. The water pressure was applied below the elevation cfthe footing drains. Nuwater pressure was applied above the footing drains. Per the civil plans the footing drain will 6e1G"above the top ofslab. Water pressure was added tothe wall for the bottom 1O". This load case does not govern the design o;the interface shear adequate. Refer tnthe attached interface shear calculation. Vault slab thickness and reinforcement has been increased. Refer tmattached buoyancy calculation. fill P iiiiiiililiiliiii 1 :1 1111111 1:1111111111 11111111111 111111111 11111!11 111 11111111111 �111 irn� 1111 !11 111111111111 1 1111111 10 if you have any questions or comments regarding the responses to this review please do not hesitate to call. Sincerely, CG Engineering Dennis Titus, PE, 5E 250 4'h meS[�on�wm�o� °�m�� ~�==�p. 425778o500 f. 425,778.5536