Loading...
20140813171758385.pdfI OX-rd"litecture 44 Rai iwd /V;tmj o Suito A7 ui�ld,, %dVm0)q1 MOM (425} !)V,0948 jlrw M'i) 15V 2439 In PO Awl[fle, 4au (am August 11, 2014 Chuck Miller, Plans Examiner City of Edmonds Building Division 121 5th Avenue North Edmonds, Washington 98020 RE: Plan review comments for BLD2014-0508 The drawings for this project have been revised to address the comments in your previous correspondence and communications with the owner, Steve Balas. To summarize: 1 . The new heated space will be insulated to meet the current energy code requirements, and noted as such on the plans. 2. The new beam has been sized by an engineer. His calculations are included. 3. The existing roof framing is shown for reference over the area of the new beam. If additional modifications to the drawings are required, could you just mark those on the approved plans? That way we can avoid another correction letter and the resubmittal of new drawings. Please don't hesitate to contact me with additional questions. Thanks for your help. Sincerely, PWF Architecture, LLC Philip W. Frisk, AIA, Principal Washington State Architect Registration Number 7320 CC: Steve Balas