Loading...
2014-0814 Stoulil (Bykonen) - 2nd Review.pdf City of Edmonds PLAN REVIEW COMMENTS BUILDING DIVISION (425) 771-0220 DATE: March 12, 2015 TO: Ryan Stoulil rs128@hotmail.com FROM: Andrew Gahan, Plans Examiner nd RE: Plan Check: BLD2014-0814 (2 Review) – Review of Revised Plans Project: Stoulil Addition rd Project Address: 533 3 Avenue S. During a review of the revised plans by the Building Division for the above noted project, it was found that the following information, clarifications, or changes are needed. A complete review cannot be performed until the revised plans/documents, including a written response indicating where the ‘clouded’ or otherwise highlighted changes can be found on the revised plans, have been submitted to a Permit Coordinator. Reviews by other divisions, such as Planning, Engineering, or Fire, may result in additional comments. Sheet 2 1.The existing foundation wall along the interface with the addition area will experience a change in loading with regard to a surcharge imposed by the slab-on-grade floor and floor live loading. Please verify the adequacy of the existing wall to support the new surcharge. It may be sufficient to simply tie the new slab into the top of the existing wall. 2.Specify safety glass at the window above the toilet within the bathroom behind the garage.