20140819083344660.pdfSubmittal Transmittal
W-0112
DAVID EVANS
A..ASSOCIATES
Client: City of Edmonds
DEA Submittal No. 1
Description: Prestige Care Detention Vault Review (Task Order 14-01)
Received: 8/14/2014
Resubmittal of : Rev. 1
Bid Item : n/a
Reviewed
Rejected
Submit Specific Item
Submittal Comments:
Furnish As Corrected
F-1 Revise and Resubmit
Provide direction to contractor regarding the interfacing between the water stop and the top mat of steel in the slab (See Detail
1 SV3.1). The water stop goes 3" below the joint between the slab and the wall which means it is protruding below the top mat
of steel.
This review is only for general conformance with the design concept of the project and general
compliance with the information given in the Contract Documents. Corrections or comments made on the
shop drawings during this review do not relieve contractor from compliance with the requirements of the
Contract Documents. Approval of a specific item shall not include approval of an assembly of which the
item is a component. Contractor is responsible for: dimensions to be confirmed and correlated at the
jobsite; information that pertains solely to the fabrication processes or to the means, methods,
techniques, sequences and procedures of construction; coordination of the Work of all trades; and for
performing all work in a safe and satisfactory manner.
Office Engineer: Mark C. Frymoyer, P
DATE: 8/18/2014
Copies To:
Contractor Proj. File ® Owner ROM