Loading...
20140821145811287.pdfDenv'fls M. Bruce, P.E. �-F,7-7,F 61-iR . ...... . . .. . ..... —@I _/1111C115v, 41"IE-1—r i g 1 f _i­ eer City of Edmonds c/o Waite Architect email: waitearch@comcast.net Subject: Geotechnical Inspections — Field Reports Salinas Now Garage 1246 Viewland Way, Edmonds This engineering report presents the results of on --site geotechnical inspections for the new garage project at 1246 Viewland Way, Edmonds, Washington. These inspections were reg 1!�irq.d as a condition of permit by the City of Edmonds. REFERENCES: * City of Edmonds approved plans by Waite Architects * Geotechnical Report by D. Bruce, P.E., dated September 17, 2013 * Site photographs by D. Bruce, PE, (attached) BACKGROUND: As required by City of Edmonds, this engineer performed a geotechnical investigation for the proposed new garage structure. Geotechnical issues were primarily concerned with the adjacent "steep slope" zone at the rear (easterly) of the property. Project architect incorporated the geotechnical recommendations for the project in the plans and was subsequently granted a permit. INSPECTIONS. This engineer observed excavation as required by City of Edmonds (see photos), The subgrade soils was verified to provide a minimum of 2,000 p.s.f, bearing capacity. All excavation complied with the layout and setback distance per approved plans, S -1 OILS FOLINIDATIONS HT M_---C,7'10JV DRAINAGE` DESIGN&PE_AMJ7" LEGAL F1.0,r3ox56502 Shor(,)Iii-ie,VVacliii-igton93'155 (206)546-92,17 dbrucepe@9rnai1xon,, City of Edmonds Re: Salinas Property, 1246 Viewland Way July 25, 2014 Page 2 Follow up inspections verified proper subgrade bearing, crushed rock sub -base, form work and reinforcing steel. "OK" to proceed with concrete placement per City of Edmonds approved plans. All temporary erosional control measures were approved by this engineer: siltation fencing, confinement of all work within property lines, and no adverse impact to the adjacent "steep slope". Geotechnical inspections verified proper compliance with the recommendations of the Geotechnical Report, City of Edmonds approved plans, and normal, good construction practices. 0 "OK" to place concrete per City of Edmonds approved plans and inspections. ® This report completes Special Geotechnical Inspections by D. Bruce, P.E. If there are any questions, do not hesitate to call, Dennis M. Bruce, P.E. Geotechnical / Civil Engineer ..,� ..mow. f' 1246 Viewland Way, Edmonds Excavation stable. No adverse impacts to rear slope. Dense soil subgrade, as per geotechnical report: Compacted crushed rock subbase. "O.K." to place foundation concrete per approved plans. Good erosion control. No adverse impacts to rear slope.