Loading...
2014-0871 Harter addition-ADU2 - Riverside Arch.pdf City of Edmonds PLAN REVIEW COMMENTS BUILDING DIVISION (425) 771-0220 DATE: November 5, 2014 TO: Riverside Architecture Jeff Price jeff@riverarch.net FROM: Chuck Miller, Plans Examiner RE: Plan Check: BLD2014-0871 Project: Harter addition th Project Address: 9630 238 Street SW During a review of the plans by the Building Division for the above noted project, it was found that the following information, clarifications, or changes are needed. A complete review cannot be performed until the revised plans/documents, including a written response indicating where the ‘clouded’ or otherwise highlighted changes can be found on the revised plans, have been submitted to a Permit Coordinator. Reviews by other divisions, such as Planning, Engineering, or Fire, may result in additional comments. Items that recur on this list appear in italics. On sheet A1: 1.Proposed Foundation Plan - Clarify the callout for the ‘SB5/8x24’ anchor bolts to be used to attach the ‘HDU2-SDS2.5’ holdowns at each end of the two ‘P1-6’ shearwalls along the west side of the garage. The lengths of the stemwalls do not appear to meet the manufacturer’s installation requirements of the anchor bolts. The unique installation criteria of holdown anchorages require those details to be included in the referenced details. On sheet A8: 2.Proposed Finishes Plan - Indicate on the plans the method to be used to provide the required whole house mechanical ventilation per M1507.3 for the portion of the structure to be used as an ADU. The provision of a ‘wall-mounted whole house vent’, as represented on the plans, does not appear to be equivalent to any of the four mechanical ventilation methods found in section M1507.3.