Loading...
2014-0942 Caryl.pdf City of Edmonds PLAN REVIEW COMMENTS BUILDING DIVISION (425) 771-0220 DATE: October 16, 2014 TO: Van Caryl vcaryl11@gmail.com FROM: Andrew Gahan, Plans Examiner RE: Plan Check: BLD2014-942 Project: ADU/Cantilevered Deck th Project Address: 15701 75 Place W. During a review of the plans by the Building Division for the above noted project, it was found that the following information, clarifications, or changes are needed. A complete review cannot be performed until the revised plans/documents, including a written response indicating where the ‘clouded’ or otherwise highlighted changes can be found on the revised plans, have been submitted to a Permit Coordinator. Reviews by other divisions, such as Planning, Engineering, or Fire, may result in additional comments. Non-structural Items Sheet A2.02 (Level 1): 1.Please add a carbon monoxide detector outside of and in the vicinity of the sleeping rooms per IRC R315. 2.Verify that exhaust fans are in place where required by IRC Table M1507.4 including in the kitchen, bathroom and (as already shown) in the laundry room. 3.Please indicate which fire-rated assembly will be used to obtain the minimum 1-hour fire rating between the dwelling units (as has been done regarding the floor/ceiling assembly). 4.Note on the plans that all through penetrations and/or membrane penetrations shall comply with IRC R302.4. 5.Indicate on the plans the location of the water service shut off valve, which must be equally accessible at all times to occupants of both dwelling units per UPC 605.2. Sheet A2.03 (Level 2): 6.Verify that the stair width is a minimum of 36” wide and a hand rail is in place per IRC R311.7. 7.Verify that the porch along the west elevation of the structure is less than 30” above the finished grade. If it is found to be above 30” above grade a guardrail will be required per IRC R311.7.8. 8.Add a carbon monoxide detector on Level 2 per item #1 above. 9. Please verify exhaust fans are in place on ‘Level 2’ per item #2 above. Structural Items Sheet S-2 10.Please provide a roof framing plan and number the beams/headers to be analyzed for clarity in reviewing the structural calculations. 11.Provide a foundation plan indicating how the posts supporting the new beams will be supported. 12.Verify that the beams specified in the calculations match those specified on the plan, e.g. the calculations show the use of an MC8x21.4 member, and on the plans that beam is called out as an MC7x22.7. Page 2 of 2