20141021155024895.pdf17217 7Th Ave. W.
Bothell, WA. 98012
(206) 390-8374
Fax: 425-741-8214
October 17, 2014
Ms. Jennifer Lambert
City of Edmonds
Engineering
Edmonds, WA 98012
Re: Engineering Plan Review Comment Letter dated October 1, 2014
BLD 20140872
Dear Jennifer
I received your review letter and per our previous conversation have addressed each item as follows:
GENERAL
1. Done
2. Done
COVER SHEET C-1 GENERAL
1. Done
2. Added
3. Note added to C-1
EXISTING SHEET C-2 GENERAL
1. Utility info removed
2. General Note revised to WSDOT 2014
TESC
SHEET C-3 GENERAL
1.
Title revised
2.
Grading calc added to sheet
3.
Reference to Std Detail E1.2 added
4.
Reference to Std Detail E1.3 added
5.
Reference to Std Detail E 1.1 added
6.
Construction sequence revised
Ms. Jennifer Lambert
Page 2
October 17, 2014
DRAINAGE AND DETAILS SHEET C-4
GENERAL
I. Title revised
2. Driveway width changed to 12 -ft
3. Curb/gutter noted added
4. 2 -ft asphalt cut and noted added to plan
5. Driveway to be concrete
MINIX Im V
I. a) New line shown, b) meter show at R/W line, c) note added for 1" meter, d) 1-1/2 pipe note
WATER
1. The side sewer was scope and showed a 4" DI pipe from the house to the property line the a
6" inch line from the property to the main. The plans show the as -built locations and the
existing 4" pipe to be removed and replaced with 4" pvc which will tie into the existing 6"
main at the property line,
Z See] above
3. Exist pipe material and size labeled on the plans.
4. New sewer pipe to tie into exist 6" line at the property line
5. 12" Lamphole cover added.
& See I & 3 above
7. Cleanouts added at house.
8. Invert shown and the slope is less than 6%
WATER
I . Chart added to plan
2. Impervious area added
1 Covered patio is part of the roof. Impervious area clarified
4. The infiltration rate was determined using the PIT Infiltration test pit. The design is using 2
inches per our which includes a factor of safety of 2. TIR report revised.
5. Observation well shown
6. Footing drain shown tying into separate drywell
DRY UTILITIES
1. Dry utilities shown
2. Note added to bottom of sheet
Sincerely,
Richai-d Deecio P.E.
Deecio Engineering Inc