Loading...
20141031121654115.pdfRJA- ARCHITECT October 29, 2014 17710 DETROIT AVENUE LAKEWOOD, OHIO 44107 PHONE216) 521-5134 FAX(16)6214824 Mr. Leif Bjorback, Building, Official City of Edmonds Building, Division 121 5t" Avenue N. Edmonds, WA 98020 Regarding: Harbor Freight Tools Edmonds, WA Plan Check: 2014-0693 Revision #1 Our Project No. 14145 Mr. Bjorback, The following list describes revisions made to the drawings in response to the plan review comments received for the above referenced project. 1. Due to the change in the scope of work, the tenant, (Harbor Freight Tools), undertook the supply and installation of the roof top units. These revisions were clouded and designated as delta 2, Bulletin #2 and dated as 10/01/14. Also as part of this bulletin, the trash enclosure was removed from the project per a memorandum dated September 12, 2014, from Steve Fisher, (City of Edmonds Public Works), waiving the required trash enclosure, (memorandum attached). Below is a list of the sheets that were revised. a.) A1.0 Trash enclosure was removed from site plan and details were removed from sheet. b.) A1.1: Trash enclosure was removed. Bollards were added at back of slab to prevent container from being pushed back off slab. c.) A1.2: See note for Sheet A1:1 above. d.) A1.3: See note for Sheet A1:1 above. e.) A3.0: See note for Sheet A1.1 above. f.) A4.: New sheet was added to the set to show the roof framing for the new roof top units. g.) A4.5: New sheet was added to the set to show the roof framing for the new roof top units. h.) M1.1: The rooftop units were originally designed around Carrier heat pump units that were to be furnished and installed by the Landlord. The work is now to be performed by Harbor Freight Tools. Harbor Freight Tools has a national account with Lennox. Bulletin #2 encompasses changing the Carrier heat pump units to Lennox gas-fired units. This also resulted in ductwork modifications at the units to accompany the different return and supply air open i ngs/conf ig u rations at the Lennox rooftop units. The original design intent is still the same. L) M2.0 The ComCheck was modified to include the new Lennox gas- fired rooftop units in lieu of the Carrier heat pump units. j.) P1.O: The plumbing plan was modified to include gas piping to the gas-fired rooftop units. The units were initially designed around heat pumps which required no gas. Power plan was revised to the show the proper designations for the new roof top units due to the fact that the scope of work was changed. 1.) E2.11: Lighting and Panel Schedule sheet was revised. See note above for Sheet 2. New anchorage calculations were submitted with the revised sheets. See attached structural calculations from KPFF Consulting Engineers. 3. Acknowledged. Structural calculations have been revised to reflect 25 psf snow load. .. ..... .... Bryan l4atthews, Architect RJA Architects, Inc. City of Edmonds Development Services Department October 29, 2014 Edmonds, WA Our Project No. 14145