20141031121654115.pdfRJA-
ARCHITECT
October 29, 2014
17710 DETROIT AVENUE
LAKEWOOD, OHIO 44107
PHONE216) 521-5134
FAX(16)6214824 Mr. Leif Bjorback,
Building, Official
City of Edmonds
Building, Division
121 5t" Avenue N.
Edmonds, WA 98020
Regarding:
Harbor Freight Tools
Edmonds, WA
Plan Check: 2014-0693
Revision #1
Our Project No. 14145
Mr. Bjorback,
The following list describes revisions made to the drawings in response to
the plan review comments received for the above referenced project.
1. Due to the change in the scope of work, the tenant, (Harbor Freight Tools),
undertook the supply and installation of the roof top units. These revisions
were clouded and designated as delta 2, Bulletin #2 and dated as
10/01/14. Also as part of this bulletin, the trash enclosure was removed
from the project per a memorandum dated September 12, 2014, from
Steve Fisher, (City of Edmonds Public Works), waiving the required trash
enclosure, (memorandum attached). Below is a list of the sheets that were
revised.
a.) A1.0 Trash enclosure was removed from site plan and details were
removed from sheet.
b.) A1.1: Trash enclosure was removed. Bollards were added at back of
slab to prevent container from being pushed back off slab.
c.) A1.2: See note for Sheet A1:1 above.
d.) A1.3: See note for Sheet A1:1 above.
e.) A3.0: See note for Sheet A1.1 above.
f.) A4.: New sheet was added to the set to show the roof framing for
the new roof top units.
g.) A4.5: New sheet was added to the set to show the roof framing for
the new roof top units.
h.) M1.1: The rooftop units were originally designed around Carrier heat
pump units that were to be furnished and installed by the Landlord.
The work is now to be performed by Harbor Freight Tools. Harbor
Freight Tools has a national account
with Lennox. Bulletin #2 encompasses changing the Carrier heat
pump units to Lennox gas-fired units. This also resulted in ductwork
modifications at the units to accompany the different return and supply
air open i ngs/conf ig u rations at the Lennox rooftop units. The original
design intent is still the same.
L) M2.0 The ComCheck was modified to include the new Lennox gas-
fired rooftop units in lieu of the Carrier heat pump units.
j.) P1.O: The plumbing plan was modified to include gas piping to the
gas-fired rooftop units. The units were initially designed around heat
pumps which required no gas.
Power plan was revised to the show the proper designations for
the new roof top units due to the fact that the scope of work was
changed.
1.) E2.11: Lighting and Panel Schedule sheet was revised. See note
above for Sheet
2. New anchorage calculations were submitted with the revised sheets. See
attached structural calculations from KPFF Consulting Engineers.
3. Acknowledged. Structural calculations have been revised to reflect 25 psf
snow load.
.. ..... ....
Bryan l4atthews, Architect
RJA Architects, Inc.
City of Edmonds
Development Services Department October 29, 2014
Edmonds, WA Our Project No. 14145