October 31, 201.4
City ofEdmonds
Development Services Department: Planning @\Building
Attri.: Chuck Miller
Re: Plan Check: BLD203.4-0930 `
Response to Correction Notice #1—review type. BUILDING DIVISION
I Handrail notes — Code reference updated —rev. #1
2 Whole house ventilation notes --- Code reference updated — rev. B2
3 Sheet index — Missing sheets E -I and E-2 included in resubrnittal. ADOI and AD02 removed
from Sheet index and UotsVbrnitted—rev. #3
4 Existing floor plan — Roorn use label added on existing floor plan --.- rev. #4
5 Existingfloor plan — Roorn use label added on existing floor plan — rev. #5
ORE19M
S Smokedetectoo—CVdereferenceupdated—rev. #6
7 Carbon monoxide alarm — Incorrect wording has been eliminated fnzrnnote —rev.47
8 Ventilation Schedule --- Code reference updated .-- rev. 9.8
9 Project basement Plan — Section reference updated to correctly locate detail in plan set --
10 Project first floor plan
a. Use ofeach roomindicated onplans —rev. #10
b. Smoke a|armindicated onplans outside ofsleeping area per R308.4.2.—rev. #10
c. Safety g|adn0-Window in masterbath chanRedtw#14and labeled assafety glass oo
plans and inwindow schedule omSheet 2.l—rev. #10
d. Safety glazing-- VViD6gm/ in master bedroom changed to #14 and labeled as safety glass
onplans and |nwindow schedule onSheet 2.1 - rev. #10
8!TY���Q�nND�
V A
f. No new loads are being irnposed on the existing beam over the window in the den,
therefore the existing beam is adequate to contiritieto support the existing loads.
g. No new loads are imposed on the beam over the opening to the 'Den', therefore the
existing beam is adequate to continue to support the existing loads.
Pietro Potesth
ALCOVA architecture company
1725 Westlake Ave N, suite 1.10
Seattle, WA 98109
p. 206 660 6818
pietro@alcovaarch.corn