Loading...
20141120104127081.pdfR 0 �4'vfm�A' A R C 11 1 T k' C T U R ' 10604 E. Rivemide J-)rive, Bothell, IN, November 1q, 2014 Chuck Miller Plans Examiner Development 5ervice5 Department - wilding Division City of Edmonds 121 Et" Ave. North Edmonds, YNA c0020 NOR kIf"JV 1 9 '2' ["0 1� mvw.ri\/er'ar(..h.net The following are our responses to your Letter dated November 15, 2014.. 1. The anchor bolt callout on the PROP05EP A.P.U. FOUNDATION PLAN, 5heet Al, has been revised to coordinate with Detail 5, 5heet 53. 2. The response from the Structural Engineer was provided under separate cover, and has been attached. WaRIFIMST.-WIZI ,jeff@riverarch.net Page I of 1 Date: November November 19, 2014 To: Riverside Archtecture Attn: Jeff Price From: Brian Lampe, P.E., S.E. Project: Harter ADU Dear Jeff, f 19011 Wood Sno Road NE, Suite 100 Woodinville, WA 98072-4436 Phone: (425) 814-8448 Fax: (425) 821-2120 The following is in response to the plan review comments dated November 18, 2014: On sheet S3: 2. Detail 3 — Clarify the difference in the callout for the anchorage for the `HDU' holdowns and that required on sheet `A1'. The plans should consistently reflect the required construction to guide proper review, installation, and inspection. Changes to work performed by a registered engineer must be supported by updated calculations and be stamped by the engineer of record. " HDU" is a generic identifier meant to clarify the holdown series. The actual holdown callout is specified on the plan as indicated in detail 2/S3. Give me a call if you have any questions or comments. Sincerely, Brian Lampe, P.E., S.E. BTL Engineering