Loading...
2014-1182 ESD playfields phase 1 - DA Hogan.pdf City of Edmonds PLAN REVIEW COMMENTS BUILDING DIVISION (425) 771-0220 DATE: December 29, 2014 TO: Matt Finch finchm@edmonds.wednet.edu FROM: Chuck Miller, Plans Examiner RE: Plan Check: BLD2014-1182 Project: ESD playfields – Phase 1 Project Address: 23200 100th Avenue W During a review of the plans by the Building Division for the above noted project, it was found that the following information, clarifications, or changes are needed. A complete review cannot be performed until the revised plans/documents, including a written response indicating where the ‘clouded’ or otherwise highlighted changes can be found on the revised plans, have been submitted to a Permit Coordinator. Reviews by other divisions, such as Planning, Engineering, or Fire, may result in additional comments. On sheet F-1.0: 1.Site Overview – Provide a detail indicating the required design and construction per IBC 1604.1 for the field lighting support bases represented at various locations around both playfields. Work associated with the electrical system for the field lighting is to be completed under a separate permit obtained through the Washington State Department of Labor & Industries. On sheet F-1.1: 2.Layout Plan – South Phase 1 a.Indicate on the plans that the walkway represented along the east side of the playfield is connected to, or will provide, the required accessible route per IBC 1103.1. b.Indicate on the plans that the bleachers/portable spectator seating represented along the north side and the southeast corner of the playfield comply with ICC 300 per IBC 1028.1.1. c.Indicate on the plans that any team or player seating provided in the ‘dugouts’ represented along the northeast and southeast corners of the playfield have at least one wheelchair space required per IBC 1108.2.2.4.