Loading...
2014-1338 Graber carport.pdf City of Edmonds PLAN REVIEW COMMENTS BUILDING DIVISION (425) 771-0220 DATE: January 8, 2015 TO: Joseph Graber joegraber@hotmail.com FROM: Chuck Miller, Plans Examiner RE: Plan Check: BLD2014-1338 Project: Graber carport rd Project Address: 1030 3 Avenue S During a review of the plans by the Building Division for the above noted project, it was found that the following information, clarifications, or changes are needed. A complete review cannot be performed until the revised plans/documents, including a written response indicating where the ‘clouded’ or otherwise highlighted changes can be found on the revised plans, have been submitted to a Permit Coordinator. Reviews by other divisions, such as Planning, Engineering, or Fire, may result in additional comments. On sheet 1: 1.Roof Plan – Indicate on the plans the required structure to support the lower end of the east- facing roof rafters to guide proper review, construction, and inspection. On sheet 2: 2.Framing Cross Section a.Clarify the callout for the ¾-inch diameter threaded rod to be used as anchorage for the ‘ABA46Z’ post base. It is greater than that specified without modifying the post base, which is prohibited by the manufacturer. b.Clarify the callout for the for the ‘pressure-treated hem-fir premium grade’ 4x10 beams to be used to support the roof loads. They appear to be over spanned, fail in bending, and deflect beyond that allowed per IRC Table R301.7, even when calculated without the PV panels – see attached. c.Indicate on the plans the required blocking between each of the rafters per IRC R602.10.8.2.