Loading...
2015-0032 Cedar View Memory Care Facility Revision 4 2- LJB Designs.pdf City of Edmonds PLAN REVIEW COMMENTS BUILDING DIVISION (425) 771-0220 DATE:July 28, 2017 TO:Edmonds Memory Care, LLC Jeff Yates jeff@rjdevelopmentservices.com FROM:Chuck Miller, Plans Examiner nd RE:Plan Check: BLD2015-0032 – Revision 4 – 2 review nd Project Address: 21006 72 Avenue W Project: Cedar View Memory Care Community Scope: Add/reconfigure cabinetry/appliances (spaces 228, 229, 328, 329, 361) - relocate water feature/add TV to Courtyard #2 – reconfigure conference/storage rd (spaces 107, 108) – alter parapet heights/exterior aesthetics – framing changes (3 floor framing/roof framing – alter Courtyard #2 balcony wall openings/top of wall anchorage/drainage – reconfigure main entry – revised concrete shearwall details – B/R-2/S-2 occupancy groups – 44/889/79 occupants (or as permitted by WA State DOH license) – IIA-VA construction – NFPA 13 sprinkler system required – mechanical, plumbing, fire sprinkler, fire alarm, etc. under separate permits Please be advised that the building plans for the above referenced project have been disapproved for the purposes of obtaining a building permit. During a review of the plans by the Building Division for compliance with the applicable building codes, it was found that the following information, clarifications, or changes are needed. Reviews by other divisions, such as Planning, Engineering, or Fire, may result in additional comments that require attention beyond the scope of this letter. A complete review cannot be performed until the revised plans/documents, including a written response in itemized letter format indicating where the ‘clouded’ or otherwise highlighted changes can be found on the revised plans, have been submitted to a Permit Coordinator. nd Resubmittals must be made at the Development Services Department on the 2 Floor of City Hall. Permit Center hours are M, T, Th, & F from 8am-4:30pm and from 8:30am-12pm on Wednesdays. General plan revision review note: 1.Resolved - The following updated/additional sheets have been provided: A4.3 – Reflected Ceiling Plan – to reflect changes in the openings in the east wall of ‘Courtyard #2 on revised sheets. A9.1 – Interior Elevations - to reflect changes in ‘Courtyard #2’ and space ‘361’ – Life Station - per callouts on revised sheet ‘A3.7’. A12.3 – Window Types and Details - to reflect changes in the openings marked ‘P1’- Courtyard #2 Metal Grate - in the east wall of ‘Courtyard #2 on revised sheets. On sheet A7.1 – Building Sections: 2.Resolved - The reference to the 1-hour fire-resistance rated floor/ceiling has been changed to assembly ‘B’ – see sheet ‘A2.3’ - for the third floor framing on the following ‘sections’: A/A3.1 B/A3.1 C/A3.1 D/A3.1 E/A3.1 On sheet A8.1 – Wall Sections: 3.Resolved – A note referencing assembly ‘B’ on sheet ‘A2.3’ has been added to the plans to clarify the reference to ‘TJI’ wood i-joists for the third floor framing on the following ‘sections’: 1/A7.1 2/A7.1 3/A7.1 4/A7.1 On sheet A8.2 – Wall Sections: 4.Wall Section 6/A7.1 – Resolved - A note referencing assembly ‘B’ on sheet ‘A2.3’ has been added to the plans to clarify the reference to ‘TJI’ wood i-joists for the third floor framing. On sheet A8.3 – Wall Sections: 5.Resolved - A note referencing assembly ‘B’ on sheet ‘A2.3’ has been added to the plans to clarify the reference to ‘TJI’ wood i-joists for the third floor framing on the following ‘sections’: 8/A6.1, 8/A7.1 9/A6.2 10/A6.1 11/A6.1 On sheet A8.4 – Enlarged Stair Plans – Stair Section & Details: 6.Wall Section 13/A8.4 - Resolved - A note referencing assembly ‘B’ on sheet ‘A2.3’ has been added to the plans to clarify the reference to ‘TJI’ wood i-joists for the third floor framing. Page 2 of 4 On sheet A8.5 – Elevator Sections: 7.Resolved - A note referencing assembly ‘B’ on sheet ‘A2.3’ has been added to the plans to clarify the reference to ‘TJI’ wood i-joists for the third floor framing on the following ‘sections’: 13/A3.1 18/A3.1 Additional plan review comments regarding resubmitted construction documents: General plan review note: 8.Clarify the submittal of the following construction documents in response to the earlier plan review comments: A0.0 A2.3 A3.2 A3.3 A3.6 A3.7 A4.3 A7.1 A8.1 A8.2 A8.3 A8.4 A8.5 A9.1 A12.3 They appear to have been prepared/stamped/signed by a different registered design professional – Lyle A. Bremmeyer - than that established as the ‘design professional in responsible charge’ per IBC 107.3.4. Specific requirements regarding the submission of documents prepared by another architect are established in Chapter 18.08 of the Revised Code of Washington (RCW). Provide a letter to the Building Official indicating the status of the designated ‘design professional in responsible charge’ per IBC 107.3.4. An acceptable alternative may be the provision of a letter prepared by the current ‘design professional in responsible charge’ – Richard Swanson – acknowledging the sheets prepared by Lyle A Bremmeyer are to be considered as ‘of-his-own-hand’. On sheet A2.3 – Rated Assembly: 9.Assembly B – Provide on the plans the required installation criteria to develop the 1-hour fire-resistance, the sound transmission class, and the impact insulation class for the floor/ceiling assembly. Specific information, such as that found in ICC-ES Report ‘ESR- 2994’ Section 4.17.2, Items 5 and 6, and in Section 4.20.1 or Section 4.20.2, must be provided on the plans to guide proper installation and inspection. Page 3 of 4 Page 4 of 4