PLAN REVIEW COMMENTS
BUILDING DIVISION
(425) 771-0220
DATE: January 28, 2015
TO: Eric Johnson
eric@washingtonelectric.net
FROM: Chuck Miller, Plans Examiner
RE: Plan Check: BLD2015-0090
Project: Warren generator
nd
Project Address: 23232 92 Avenue W
During a review of the plans by the Building Division for the above noted project, it was found that
the following information, clarifications, or changes are needed. A complete review cannot be
performed until the revised plans/documents, including a written response indicating where the
clouded or otherwise highlighted changes can be found on the revised plans, have been submitted
to a Permit Coordinator. Reviews by other divisions, such as Planning, Engineering, or Fire, may
result in additional comments.
On sheet 2:
1.North Elevation Clarify the representation of the generator installation below and in front
of a window. Generators must be installed per the International Mechanical Code (IMC),
the manufacturers installation requirements, and the National Fire Protection Association
(NFPA) 37. The NFPA requires a minimum distance of five feet between the generator and
any openings in the walls, including sealed windows see attached.