Loading...
2015-0100 Dragich remodel.pdf City of Edmonds PLAN REVIEW COMMENTS BUILDING DIVISION (425) 771-0220 DATE: February 4, 2015 TO: Dave Marlow Integrity Custom Builders Email: icbdavemarlow@gmail.com FROM: Leif Bjorback, Building Official RE: Plan Check: 2015-0100 Project: Interior remodel Project Address: 760 Maple St During review of the plans for the above noted project, it was found that the following information, clarifications or changes are needed. In general, more information is needed on the plans in order to perform a complete review of building code requirements. Please be aware that further corrections of the plans may be necessary once a more thorough review can be done with updated plans. Please submit revised plans/documents to a permit coordinator in the Development Services Department. Thank you. 1.The proposed work includes the removal of a P1-4 shearwall at the Den. Please provide lateral calculations, stamped and signed by a licensed engineer, to justify the removal of the shearwall, and modify the design and drawings as needed.