2015-0100 Dragich remodel.pdf
City of Edmonds
PLAN REVIEW COMMENTS
BUILDING DIVISION
(425) 771-0220
DATE: February 4, 2015
TO: Dave Marlow
Integrity Custom Builders
Email: icbdavemarlow@gmail.com
FROM: Leif Bjorback, Building Official
RE: Plan Check: 2015-0100
Project: Interior remodel
Project Address: 760 Maple St
During review of the plans for the above noted project, it was found that the following information,
clarifications or changes are needed. In general, more information is needed on the plans in order to
perform a complete review of building code requirements. Please be aware that further corrections of
the plans may be necessary once a more thorough review can be done with updated plans.
Please submit revised plans/documents to a permit coordinator in the Development Services
Department. Thank you.
1.The proposed work includes the removal of a P1-4 shearwall at the Den. Please provide
lateral calculations, stamped and signed by a licensed engineer, to justify the removal of the
shearwall, and modify the design and drawings as needed.