Loading...
20150106100217956.pdfTo: JoAnne Zulauf City of Edmonds From Duffy Ellis duffy()cesolutions.us 206.930.0342 Date: Sunday, January 4, 2015 CES Job: 1289 Re: Comment Response Dec 16, 2014 Revision e-mail McDonald Residence 19110 80t" Ave W Edmonds, WA 98026 Hi, Joanne. I have revised these plans in response to your email on Dec 16. 1 hope we can get this approved. I think there is plenty of information to install this grinder pump. Highlights of revisions follow. See plans which I highlighted for reference. ® C2.0: o Notes added about concrete anti -float base o Reference note to new diagram on C3.2 added o The side sewer is installed at 2% per chat with Todd. Note revised to 2% o "or equal" removed as requested in your email 0 36" depth requirement is called out on C2.0 in a few places and on C3.2 ® C3.2 o New diagram added to upper right of plans that shows relevant info in profile as requested, including another reference to anti -float concrete base. o Inverts shown. o Please see pump curve with point on curve where Todd's 8 feet of TDH (total dynamic head) falls which indicates expected flow rates in the 42 to 44 gpm range. Thanks and hope this is finish line, Duffy Duffy Ellis, PE 2244 NW Market St Seattle, WA 98107