Atthe owner request, and in part to address some of the concerns raised so far, we are introducing a
partial structural revision of the main floor deck: the area above Rec room and Gym is now a new deck
system and it includes the demo of the existing deck. Also after opening the existing drywall we were
able to better measure the existing girder beams in the garage whose section is 4x14 (odd size for
dimensional wood; actual |s3.5"x13.25").
1. Sheet A-03 and consistently throughout the plan set, the existing girder beamcaUout now says
"4x14beam below jobt".Rev. I -Sheet A-03
l Due torevision inthe plans, the girder beam over the opening inthe den /RecRoom, isno
longer required. Please see new ca|csfor deck system. Rev. 2'Sheet S -3,A -05,A-10
3. Each existing girder beam /3 8x 13 Y4\ to besistered with a C12x2O.7 channel. Please refer toV2
for calculations. Rev. 3 -Sheet S-3
4. For location ofthe isolated footing.pleaserefer,to architectural drawIngs for all dimensions. Rev.
2 - Sheet A-05
5. Structural Floor Plan:
a. Please refer tocalculations nnV2for justification of4x8header
b. The garage header was changed toaLSL3 Y2xl1/7/8.Refer tocalculations onV2.
c Refer toarchitectural drawings for all dimensions. Rev. 2 -Sheet A'05
ALCOVAarchitecture company