Loading...
2015-0158 Suller (Emmons).pdf City of Edmonds PLAN REVIEW COMMENTS BUILDING DIVISION (425) 771-0220 DATE: March 17, 2015 TO: Patricia Emmonds Architecture & Fine Art pat@pkearch.com FROM: Andrew Gahan, Plans Examiner RE: Plan Check: BLD2015-0158 Project: Addition th Project Address: 305 6 Avenue S. During a review of the plans by the Building Division for the above noted project, it was found that the following information, clarifications, or changes are needed. A complete review cannot be performed until the revised plans/documents, including a written response indicating where the ‘clouded’ or otherwise highlighted changes can be found on the revised plans, have been submitted to a Permit Coordinator. Reviews by other divisions, such as Planning, Engineering, or Fire, may result in additional comments. Non-structural 1.Please verify that the ramp from the new bedroom down to the walk has a maximum slope of 1:8 (12.5%) along a walk line measured 12” from the inside radius. 2.Per UPC 408.5, a 2” minimum threshold is required for containment. If a trench drain is desired to allow for an accessible shower, details for the trench drain must be provided. 3.Specify safety glass at the shower window and at the entry windows. 4.Provide a crawlspace access per IRC R408.4 and verfify crawl space ventilation per IRC R408.2. 5.Please provide specifications regarding the insulation to be used at the 2x8 rafters to achieve R-38 minimum. 6.Provide an exhaust fan in the bathroom per IRC Table M1507.4. Structural 7.It appears that beams B1 and B3 are overstressed as shown, and the method for calculating the loading condition for beam B1 is unclear. Please revise/clarify.