Loading...
2015-0185 Rick Steves Office.pdf City of Edmonds PLAN REVIEW COMMENTS BUILDING DIVISION (425) 771-0220 DATE: February 27, 2015 TO: John Wolf, Architect Email: stableplatform@gmail.com FROM: Leif Bjorback, Building Official RE: Plan Check: 2015-0185 Project: Europe Through the Back Door th Project Address: 130 4 Ave N During review of the plans for the above noted project, it was found that the following information, clarifications or changes are needed. Please provide written responses as to where the changes can be found on the plans, and submit revised plans/documents to a permit coordinator in the Development Services Department. Thank you. 1.Please label the use of the new room in the basement. If it is other than storage, it may impact the occupant load and possibly egress requirements from the space. 2.The alterations require accessibility upgrades for the building per WAC 51.50 (IBC 3411.7). On the plans, either a) clearly show that the entire interior accessible route of travel complies with current code, or b) provide upgrades per the previously referenced section. If you choose to use exception #1 of that section, provide a letter (reference the code exception), stating the overall project cost, 20% of the project cost, and list the accessibility upgrades that will be done as part of this permit as well as showing that the total cost of the upgrades is at least 20%. For example, the valuation of the project as listed on the permit application is $20,000, 20% of which is $4000. The code requires that in addition to your basic construction budget, a minimum of $4000 must be spent on accessible upgrades unless the space fully complies with all current accessibility requirements. Possible features that could be considered for upgrades might include accessible toilets and sinks, restroom grab bars, door sizes and floor clearances, etc.