Loading...
20150202114501828.pdfCid' E D'4" 0 C1 Xx CITY O'FEDMONDS — ENGINEERING DIVISION SPECIAL INSPECTION AND TESTING AGREEMENT PERMIT # BI,D20140317 DATE, — - - — ------ PR0JEc,,r SITE ADDRESS. 1.591174"' P] W Edmonds W PROJECT NAME: Saunders Residence SPECIA1, INSPE CTION AGENCY *One form must be completed by each Special Inspec0on Agency or Inspector. SPECIA1, INSPECTIONS REQUIRED: Special inspections are required for this project, as applicable, in accordance with Title 18 aAnd 19,10 of the Edmonds C'ommurrity Development Code (17CDC). When required, the protect must be installed/constructed per approved plans and specifications. The owner or the registered design professional in charge shall employ mi independent testinuYinspection agency/special inspector to perform required special inspections, The special inspector shall be a qualified person with competence for inspecting tile, specific type of construction or Oper',16011 requiring special inspection. The owner, registered professional, contractor and special inspector/agency shall provide a special inspection report detailing compliance with approved pLaris and specifications directly to tlu- Engineering Division. WORK la,QIJRING EC; A1, INSPEC'TION: Special inspections will be required for the following categories of work: FOR SPECIFIC INFORMATION REGARDING REQUIRED SPECIAL, INSPECTIONS SEE THE STATEMENT OFSPECIAL, INSPECTION Nam) AS A CONDITION ON THE BUIL,DING PERMIT AND/OR ONTHE APPROVED PL,ANS. Site Excavation `site m onnoring firosion and Sediment Control BEFORE A PERivirr CAN BE ISSUED, '['he owner an(]. contractor and special inspector shall complete this agreement and return to a Permit Coordinator prior to permit issuance. APPROVAI, OF SPECIA1, UNISPECTORS: Each special irispector shall be approved by the Engineering Division prior to performing all), duties or inspections, The credentials of the specific, person performing the inspection shall be submitted. When appliCable, the company performing inspections rnum be accredited by the American Association of State Highway and Transportation Officials (AASI-ITO) R I& A.Duties and Rv�p.qvisibilifles of the,_,'-S'jktT Ins ecto-r P 1- OBSERVE WORK The special inspector shall observe the site work for conformance with the approved (stamped) plans and specifications. Special inspections are to be performed as needed, to confirm that the work being completed meets specifications and approved plans. The special inspector shall bring non -conforming items to the immediate attention of the contractor and engineer of record. The special inspector shall provide a report to the Engineering Division notifying of any items not resolved and/or not installed per the approved plans and specifications. Items not constructed per the approved plans and specifications will result in a review of the plans to determine what requirements will be needed for the project to meet the necessary storrnwater requirements; such as removal and reconstruction, re -design of the stormwater management system(s), etc. Final approval for the project will not occur until installation of all required improvements is complete and accepted by the Special Inspector and the City. The special inspector or inspection agency shall submit a final signed report or Certificate of Compliance to the City stating that all items requiring special inspection and testing were fulfilled and reported. The report shall also include a statement from the inspector stating to the best of his/her knowledge the project is in conformance with the approved plans, specifications, and approved plan revisions, if any. Items not in conformance, unresolved items or any discrepancies in inspection coverage (i.e., missed inspections, periodic inspection when continuous inspections were required, etc.) shall be specifically addressed in this report. B. Contractor Regnonsibilities 1. NOTIFY THE SPECIAL INSPECTOR OF ALL REQUIRED SPECIAL INSPECTIONS It is the duty of the contractor to notify the special inspector when work is ready for special inspection. Note, the items listed under the statement of special inspection on the building permit and as noted on the approved plans and specifications are required to have special inspections. Adequate notice shall be provided by the contractor so that the special inspector has time to become familiar with the project. All work requiring special inspection must be approved prior to concealing or covering said work. 2. PROVIDE ACCESS TO APPROVED PLANS The contractor is responsible for providing the special inspector access to approved plans at the jobsite. 3. RETAIN SPECIAL INSPECTION RECORDS The contractor is responsible to retain at the jobsite all special inspection records submitted by the special inspector. These records are to be provided to the City Engineering inspector upon request and upon completion of work. RN 30,3 1. APPROVE SPECIAL INSPECTION The Engineering Division shall approve all Special Inspectors and special inspection requirements. 2. MONITOR SPECIAL INSPECTIONS AND APPROVE REPORTS Page 2 of 3 Work requidrig special inspection and perforniance of speciai inspectors shall be monitored by the Enoneefing Division Inspector. Engineering Inspector approval "Just be obtained prior to placement of concrete or other sirailar activities inaddition to that of the, special inspector. 3. FINAL, APPROVAL The Engineering Division may provide final inspection approval after ffie special illspection report(s) have been subiaittedand accepted by the City. D. 1. The prqject owner or the engineer or afetritext of record acting as the owner's agent shall fund special inspection services. E. I. Prepare Staternent of Special Inspections, 2. Review the special inspection reports and provide corrective action for work that may not conforyu to the approved plans, ACKNOWLEDGhME NTS I have read arad are to coup,ply with the tertras and coudifions of this agreement. Owner Flame /- &-r 0 ME= ff Date General Contrador Company/owner Hanle year pflut ortyrat 44 Special Inspector/Agency name fi)ade, ,T Lasse- (rAnse Pr 1 naw`type) V -2/2-L Engineer of Record name ((AMM, pAna urs lype) flaaal:raa r' Date Return the ofiginal signed aim-eRupent to: City W'Edbyaonds Development Services Departaueag 121 5'h Avenue North, City Hall Second Floor Edmonds, WA 98020 ACCEM.TM BY MY OF EW40NTS K NGIN4 BRING DIVISK.M: ("hy Official Signature (> pal -ye 3 t & A Work requiring special inspection and perforixiance of special inspectors shall be monitored by the Engineering Division Inspector. Engineering Lispector approval must be obtained prior to placement of concrete or other similar activities in addition to that of the special inspector. 3. FINAL APPROVAL, The Engineering Division may provide final inspection approval after the special inspection report(s) have been submitted and accepted by the City. D. L)w—neK-R--e..mms-ihL1 Ctm-s- 1. The project owner or the engincerorarchitect of record acting as the owner's agent shall -fund special inspection services. +;® Fpgior AgIc :!gtect ofRecorAR 9M sibififies �L qn 1. Prepare Statement of Special Inspections. 2. Review the special inspection reports and provide corrective action for work that may not conform to the approved plans. ACKNOWLE4,DGEMENTS I have read ated agree to comp4y ivilh the terms and con difloyes of agreement, Owner rrarne (Plemprint or type) Date General Contractol C m awly/Owiler name. y gmw pAnt or ry�L) Signature w.Date. Special Inspector/Agency name (plean print or type) Date Enghacer of Record name David Dougherty August 11, 2014 y2, Date Return the o0ginal signed agweement to: City of Edmonds Development Services Depailment 1215'1' Avermue North, City Hall Second Floor Edmonds, WA 98020 ACCEVITM ]BY CITY OFEDMONDS ENGINEERING DIVISION - City Orricial . ..... ----- Pagc'i of 3