Loading...
20150205144515045.pdfENGINEERING-4 February 03, 2015 Chuck Miller, Plans Examiner City nfEdmonds 1215mAvenue N 2'mRoor Edmonds, VVA9QO20 RE: Plan Check: BLD2014-1Z45 Project Name: GBH Holdings Remodel Project Address: 311 Edmonds Street Dear Chuck, Itemized below is bur response to the review comments in the January 20, 2015 letter for the above referenced project. Our response appears inbold. General Note: 1. Provide ofloor plan for the second level and aroof framing plan per the City of Edmonds 'Permit Submittal Requirements' k`guide proper review, construction, and inspection, The second floor framing plan has been provided unDetail 2of Sheet SZ.land the roof framing plan has been provided on Detail I of Sheet S22, Sheet AO.11 Z. Site Plan Architect to respond, Architect to respond. Sheet A8.01 4. Detail 14-2-H/Floor/Ceiling Assembly Sheet S:1.11 S. HoNovvnSchedule — Provide nnthe plans the requirements for 'Note 4'referenced in the 'Anchor Bolt' specification column to guide proper review, installation, and Note 4 has been provided in the Holdown Schedule on Sheet S1.1. 311EdnxondsStApt. —14225.1O Comment Response #1 February Ol2O15 Page Zof2 Sheet S2.1 6. Detail I — Foundation Plan — Provide on the plans the required dimensions of the isolated footings to support the loads below each end of the 5-1/8 x 15 GLB over the south portion of space '102' — Open Office — to guide proper review, construction , and inspection. 7. Detail 2 — Second Floor Framing Plan — Clarify the callout for the 'existing 2x12 @ 16" OC' floor joists over the west portion used to support the loads from above. They appear to be close to their design limits using only the uniform dead and live loads of the floor. The loads from any interior walls or roof loads appear to potentially result in bending failure depending on the placement of those loads. The existing joists on the West side of the building will remain unchanged from the existing condition to the proposed condition, Based on Our Calculation of the existing condition though, the joists were determined to be adequate to support the floor dead load and live load per the attached calculations. Note that the existing 2 x 12 joists were assumed to be DF #:I based on our field observations and the age of the building. Addbiuna|k,the, capamitymfthe simteredjoists has been determined tmbeadequate to support the floor dead load and live load inaddition tothe load fromnthe bearing wall above. See the attached calculations and K)etmi|4 onSheet S4.2, Additional Revisions: 1. The wood columns supporting the g|u|mmnbeams have been changed toHSS 6mtee| columns |norder 10 provide fire protection. Sep the attached structura|calculations and Detail 2 on SheetS2.1 and Detail 3 on Sheet SM. Refer to the architectural plans for the fire |fyou have any questions orcomments regarding the responses tothis review please dnnot hesitate hu Sincerely, CG Engineering Dennis Titus, PE, SE (9= 4M Zs04mAve 5Edmonds, VVx 98020 ENGINEERING r.uz5.,/o.8s0o [4as.r/ossas