Loading...
20150206094447426.pdf1 of 5 wwwMengineers.com 7516 NE 153rd Place NE Kenmore, WA 98028 (425) 296-2993 01/19/15 Mr. Andrew Gahan Plans Examiner City of Edmonds RE: Plan Check: BLD2014-1165 Project: Heslop Remodel/Addition Project Address: 652 3rd Avenue N. Response to City Comments 12. Sheet 12 a. Wall TF was omitted from the analysis. Please revise the calculations to show wall TF. Response: Please see revised analysis showing wall TF. b. The calculations at wall TA do not match the plans. Please reconcile the calculations to match the plans. Response:The length of solid wall TA is 4.3 ft as indicated in the analysis. The rest of the shearwall contains some openings. c. The overturning force shown at wall TA exceeds the tabulated capacity for STHD10/10RJ holdowns in the Simpson catalogue. Please select a holdown with adequate capacity. Response:The holdown has been revised to STHD14RJ with ultimate capacity of 5912 lbs. The Simpson table shows service level tension capacity. They need to be multiplied with 1.4 for seismic load and 1.6 for wind load to obtain ultimate capacity. Please see attached note from Simpson table and ultimate capacity of holdowns. The shearwall analysis has been done in ultimate loads per ASCE 7-10. d. The overturning force shown at wall TE exceeds the tabulated capacity for I-IDU5 holdowns in the Simpson catalogue. Please select a holdown with adequate capacity. Response: The holdown has been revised to H 4 with ultimate capacity of 7304 lbs. The Simpson table shows allowable/service level tension capacity. They need to be converted to ultimate capacity using a factor of 1.4 for seismic and 1.6 for wind load. Please see attached note from Simpson table and ultimate capacity table of holdowns. e. Please justify the use of a 1.15 live load reduction in analyzing the floor beams. Response: Some of the beams are supporting both floor live load and roof snow load at the same time. Per code, we are allowed to use the shortest load duration factor (Cd) . In this case, the snow load has Cd= 1.15 while live load Cd= 1.0 f. It appears the no live load was applied to beam 1324. Please revise. Response: Wall loading has been applied to the beam. It includes wall dead load, roof dead load and snow load. g.Beam B2-3Acould not belocated onthe plans. Please advise. Response: Please ignore this beam calculations since it is not pad of the framing plan. Sheet S-1 To avoid confusion in reading the unCVDwaDUOn8| layout (typically, the roof framing plan is dr@vVD with the upper floor plan, the upper floor framing p|8D with the main floor plan, eiC.), p|8GSe revise the title of 1/S'1 LV 'Main F|oorP|8n/N1ain Floor Framing. Response: The title has been revised. Sheet S-2 Per item #13 ohove, please revise the Ui|e of 1/S'2 to 'Upper Floor Plan/Upper Floor Framing. Response: The title has been revised. Per item #13above, please revise the title of2/S-2to'Roof Framing P|8U'. Response: The title has been revised. Baur Bash P.E. G.E. Principal 2 2of5