Loading...
20150211135053141.pdfFebruary 10, 2015 From: Joseph Graber 1030 3Id Ave S Edmonds, WA 98020 To: Chuck Miller, Plans Examiner City of Edmonds Building Division Re: Plan Check: BLD2014-1338 Project: Graber carport Project Address: 1030 3rd Avenue S Hello, Thank you for your review and comments. I have made the following changes: On Sheet 1: - Added notes on 2x10 that supports east facing roof also included appropriate framing hardware. These structures were always part of the plan, I just missed providing the notes on the first submission. NOW== - Corrected the callout to show a 1/2" threaded rod for the ABA46Z Post Base connection to concrete. The previous designation for a 3/4" threaded rod was a mistake. I reviewed the installation instructions for ABA46Z and corrected the callout. - Improved beam bending calculations by adding a 4th 4x6 post. Span is now 10'7". Build-up beam will be used with 2 2x10s#2 SPF. This design now exceeds the L/180 requirements. - Added callouts to show the required blocking along the beam in all areas. I also included a new North facing elevation view since this view changes with the added 4th post. Please let me know if any additional changes are needed or if you have any questions. Joseph Graber (360) 707-4595