2015-0224 Neuman SFR3 - Greenwalk.pdf
City of Edmonds
PLAN REVIEW COMMENTS
BUILDING DIVISION
(425) 771-0220
DATE: June 16, 2015
TO: Steve Barnes
sbarnes@cornerstonearch.com
FROM: Chuck Miller, Plans Examiner
RE: Plan Check: BLD2015-0224
Project: Neuman SFR
Project Address: 390 Sunset Avenue N
During a review of the plans by the Building Division for the above noted project, it was found that
the following information, clarifications, or changes are needed. A complete review cannot be
performed until the revised plans/documents, including a written response indicating where the
clouded or otherwise highlighted changes can be found on the revised plans, have been submitted
to a Permit Coordinator. Reviews by other divisions, such as Planning, Engineering, or Fire, may
result in additional comments. Items that recur on this list appear in italics.
On sheet AC1 General Notes:
1.Energy Notes - Note F Update the information regarding the option selected to achieve
the minimum additional energy credits per the currently adopted code. The response to the
plan review comment states: Note F, changed as requested.. The earlier review comment
requested updated information in the context of the disparity between the stated gas demand
and the sum of that required by the individual appliances. The current response, changing
the selected WSEC Table R406.2 option from 5b (1.5 credits) to 5a (0.5 credits) requires
additional options to be selected to achieve the minimum number of credits, 1.5.
On sheet S1 Structural Notes Foundation Details:
2.Sections 1, 2, 3, 4, & 5 Foundation Detail(s) and Thickened Slab Edge Detail Clarify the
difference in the required footing and bottom of wall reinforcement specified and that noted
in the Foundations notes on the same sheet. The response to the plan review comment
states: The reinforcing schedule has been changed to it \[sic\] matches the reinforcing called
out in details.. No change was observed on the resubmitted sheet.
On sheet S3 Second Floor Framing Plan/Details:
nd
3.2
Floor Framing Plan - Clarify the callout for the 4x12s DF #2 over Bedroom 1 to be
used to support the loads from the floor framing above. They appear to be over spanned
and fail in bending. The response to the plan review comment states: Beam with wall load
above has been change \[sic\] to 5 1/8x12GLB.. No changes were observed on the
resubmitted sheet.