2015-0228 WinCo Foods TI - B Hills Arch.pdf
City of Edmonds
PLAN REVIEW COMMENTS
BUILDING DIVISION
(425) 771-0220
DATE: March 27, 2015
TO: Tristan Van Slyke
tvanslyke@bhillsarch.com
FROM: Chuck Miller, Plans Examiner
RE: Plan Check: BLD2015-0228
Project: WinCo Foods TI
Project Address: 21900 Hwy 99
During a review of the plans by the Building Division for the above noted project, it was found that
the following information, clarifications, or changes are needed. A complete review cannot be
performed until the revised plans/documents, including a written response indicating where the
clouded or otherwise highlighted changes can be found on the revised plans, have been submitted
to a Permit Coordinator. Reviews by other divisions, such as Planning, Engineering, or Fire, may
result in additional comments.
On sheet C1 Cover Sheet:
1.Code Information Occupant Load Calculation (Table 1004.1.2) Provide an occupant
load for the 10,828.89 square foot area noted as No Load using the appropriate function of
space and occupant load factor found in International Building Code (IBC) Table
1004.1.2. There does not appear to be any areas represented than would not have an
applicable load factor.
2.Drawing Index Update the provided information to include the following sheets:
S0 Structural Notes
·
S1 Foundation Plan
·
S1.1 Foundation Details
·
S2 Platform Framing
·
S2.1 Platform Framing Details
·
S3 Roof Framing Plan
·
S3.2 Roof Framing Details
·
S3.3 Roof Framing Details
·
S3.4 Support Details
·
On sheet S0 Structural Notes:
3.General - Note #7 Upon deferred submittal provide a detail(s) and a reference(s) to it for
all storage/display racking anchorage(s)/attachment(s) as follows:
Free-standing racks 59 to 80 tall - Note on the plans that anchoring is required on
·
all four corners and at intermediate locations when joined together
Free-standing racks greater than 80 tall - Engineering is required for anchorage and
·
racks (member sizes and connections, etc.)
Wall-supported racks greater than 100 tall - Engineering is required for anchorage
·
and racks (member sizes and connections, etc.)
On sheet A1 Slab Plan:
4.Slab Plan Change the Keyed Note mark for the placement of bollards around the propane
tank exchange from 33 to 17.
5.Keyed Notes
a.Note #9 Clarify the reference to sheets FP1 and FP3. No such sheets could be
found among the submitted construction documents.
b.Note #10 Clarify the reference to sheet FP3.3. No such sheet could be found
among the submitted construction documents.
c.Note #32 Provide on the plans the required reinforcement referenced As Shown
to guide proper construction and inspection.
d.Note #35 - Clarify the reference to detail SD1-3. No such detail could be found on
sheet SD1.
On sheet A1.5 Enlarged Slab Penetration Plan:
6.Right Rear Enlarged Slab Penetration Plan Clarify the cut section reference 5/A23 at
gridlines F2.5-8.5. No such section could be found among the submitted construction
documents.
On sheet A1.6 Enlarged Slab Penetration Plan:
7.Left Front Enlarged Slab Penetration Plan Clarify the section reference 1/A21 at
gridlines E7.5-3.7. No such section could be found among the submitted construction
documents.
On sheet A2 Floor Plan:
8.Floor Plan
a.Provide a Keyed Note for mark 35 in space 105 Security Processing.
b.Clarify the mark 7 at gridlines H.8-4.3. It does not appear to apply to the location
indicated.
9.General Notes Note # 6 Clarify the reference to detail A3-20. No such detail could be
found on sheet A3.
Page 2 of 4
10.Keyed Notes
a.Note #11 Clarify the information and sheet references provided. They do not
appear to apply to the locations indicated.
b.Note # 54 Change the detail reference for the Thru Wall Safe Opening from
A16-6 to A16-2.
On sheet A2.1 Platform Plans & Enlarged Partial Floor Plans:
11.Refrigeration/Air Handling Platform A Detail Clarify the mark 56 at gridlines H.5-
7.65. It does not appear to apply to the location indicated.
12.Restroom Fixture Schedule Note R9 - Clarify the reference to sheet FP3. No such sheet
could be found among the submitted construction documents.
13.Keyed Notes
a.Note #30 - Clarify the reference to sheets FP1, FP2, and FP3. No such sheets
could be found among the submitted construction documents.
b.Note #54 Change the detail reference for the Thru Wall Safe Opening from A16-
6 to A16-2.
c.Note #55 - Change the detail reference for the Coin Order Drawer from A13 to
A16-6.
On sheet A4 Exterior Elevations:
14.Left Elevation Change the mark for the downspouts at gridline 0.5 from 13 to 18.
15.Keyed Notes - Notes #3, #4, #7, and #8 - Clarify the reference to sheets FP1 and FP3.
No such sheets could be found among the submitted construction documents.
On sheet A8 Reflected Ceiling Plan:
16.Keyed Notes
a.Note #48 - Clarify the reference to detail A3-20. No such detail could be found on
sheet A3.
b.Note #100 Need more cowbell.
On sheet A9.1 Platform Floor Finish Plan & Details:
17.General Notes Note #1 - Clarify the reference to sheets FP1 and FP2. No such sheets
could be found among the submitted construction documents.
On sheet A10 Interior Elevations:
18.Keyed Notes Note #9 - Clarify the reference to detail FP3-4. No such detail could be
found among the submitted construction documents.
On sheet A11 Wall Finish Schedule & Details:
19.Restroom Fixture Schedule Note R9 - Clarify the reference to sheet FP3. No such sheet
could be found among the submitted construction documents.
Page 3 of 4
On sheet A12 Door Schedule, Window Types & Details:
20.Door Types Clarify the detail callouts for the Standard STD Manual Overhead
Sectional door. They do not appear to apply to the door represented.
21.Window Types Clarify the detail callouts for the smaller of the two windows represented.
They do not appear to apply to the window represented.
22.Detail 15 Overhead Sectional Sill - Clarify the reference to sheets FP1 and FP3. No
such sheets could be found among the submitted construction documents.
23.Detail 166 Overhead Coiling Door @ CMU (Jamb) Change the detail number from
166 to 16.
On sheet A18 Sign Supports & Closure Panel Plans & Details:
24.Detail 4 Stainless Steel Closure @ Seafood Change the section number from 5A to
4A.
On sheet A20 Pallet Racks Installation Plan, Schedules & Notes:
25.Pallet Rack Notes Note #4B - Upon deferred submittal provide a detail(s) and a
reference(s) to it for all storage/display racking anchorage(s)/attachment(s) as follows:
Free-standing racks 59 to 80 tall - Note on the plans that anchoring is required on
·
all four corners and at intermediate locations when joined together
Free-standing racks greater than 80 tall - Engineering is required for anchorage and
·
racks (member sizes and connections, etc.)
Wall-supported racks greater than 100 tall - Engineering is required for anchorage
·
and racks (member sizes and connections, etc.)
Page 4 of 4