Loading...
20150323162427582.pdf8532 236th st sw, Edmonds WA 98026 Cell: 206-795-5909 - matthewstewart@comcast.net March 17, 2015 Chuck Miller Building Division, City of Edmonds 425-771-0220 RE: Plan Check, BLD2015-0072, [Date] Hello Mr. Miller, Because of the change in scope of my building project, many of the requested clarifications and changes are no longer required as far as I know. For instance, heat credits should no longer be required, and most of the new structure no longer rests above unsupported space, so support in those locations should no longer be required. Please see "Section B" which outlines the details of a shear wall to resist lateral loads as requested. Also please note that all four corners of the porch structure are supported from their point of origins down through the foundation. Additionally I have made changes to the roof framing plan which I believe address your concerns with over span of roof framing members by the addition of knee walls mid span and by adding support below the ridge rafter. All hardware will be installed according the the manufacturers specifications. Thank you for taking the time to review these plans with me. Sincerely, Matt Stewart