Loading...
20150325150937845.pdfJoAnne, The following is our response to the corrections we received from your office re: Lot 4 Woodvale 1. Drywell moved 2. Water and sewer lines moved 3. Sewer is connected where the stub is shown. That other line is the connecting line form the note about the manhole cover We are submitting 3 complete new site plans of the project. Please feel free to contact me if you need any other information or have any questions. Joe"%ert Directol of Architectural Design Burnstead Construction Company LLC Joe 2Butnstead.coin (425) 818-7467 11980 N.E. 24th St., Suite 200, Be1lerue, 111,4 98005-1576 425 454 1900 Fax: 425 990 349 ri�iv�s�.h�.u•rzstead.carn THE 3/20/2015 S - URNSfFAD- JoAnne Zulauf City of Edmonds Engineering Division 121 5th Ave N Edmonds, WA 98020 Plan Check: BLD2015-0167 23602 105"' PI W Project: Burnstead SFR lot 4 JoAnne, The following is our response to the corrections we received from your office re: Lot 4 Woodvale 1. Drywell moved 2. Water and sewer lines moved 3. Sewer is connected where the stub is shown. That other line is the connecting line form the note about the manhole cover We are submitting 3 complete new site plans of the project. Please feel free to contact me if you need any other information or have any questions. Joe"%ert Directol of Architectural Design Burnstead Construction Company LLC Joe 2Butnstead.coin (425) 818-7467 11980 N.E. 24th St., Suite 200, Be1lerue, 111,4 98005-1576 425 454 1900 Fax: 425 990 349 ri�iv�s�.h�.u•rzstead.carn