tke: Plan Check: 2015-0145
Remodel/Addition
Project ^rrress: libr-110 50UMLI View
i 1 '
,�O.JKdANta�`,.n
("ITTY N", it DhA1( PI'1R)S
General
1) I can confirm that the cost estimate provided by Pacific Emerald Homes
matches the scope of work as defined by my drawings. I reviewed the
drawings and cost estimate with 5igve Helleren and I believe he has an
understanding of what is to removed from this house
Sheet A-2
2) That is correct, no walls will remain on the main floor, a note has been add to
the floor plan.
3) Carbon Monoxide alarms are noted on each floor.
4) You are correct, these holdowns have been noted on plan.
5) You are correct, these holdowns have been noted on plan.
(b) 5DA says this calculation is on 11A
Sheet A-5
i) You are correct, these holdown5 have been noted on plan.
5) Drawing corrected to show "HHD014" holdowns.
q) Note added that the cone slab is existing.
10) All foundations a footings on the existing house are to remain. The detail
4/52.0 does not suggest otherwise.
11) Plan was revised to show a 561anding.
Sheet A-4
12) Note was added the the Diagonal crosshatching indicates the portion of the
roof that is "flat".
13) 5PA changed their drawing to correct this.
14) A note has been added regarding the ledger attachment.
Sheet A-5
15) The 2x6 joists are now noted at 2x10 joists @ 16"o.c.