Loading...
20150326095250901.pdfrJf Ji ��� ) ✓i��7�`£ 'aS.lgk li NF1ti�'� V&f rt�✓ak'G`aG�d�l �'���� ne I ,I March 23, 2015 Mike Clugston City of Edmonds Development Services Department 121 51h Ave. N. Edmonds, WA 95020 A 98201 t. 425.387.3820 f 425.259.1958 This letter is intended to summarize the changes made to the engineering plans and reports based on the comments made during the plan review for this project. This letter addresses comments made by yourself which were provided in a letter dated February 24, 2015. 1 have tried to format this letter to match the provided comment letter for easier understanding. 1. A geotech has analyzed the project site and prepared a report. This report can be found within the Appendix of the Drainage report. 2. The biologist has inserted the 15' BSBL and this can now be seen on all plan sheets. I have now properly printed the Biologists report within 11"x17" sheets in the appendix of the drainage report. 3. Noted. (Refer to Building Plans) 4. Noted. (Refer to Building Plans) 5. Noted. (Refer to Building Plans) Thank you for taking the time to review this project. Please feel free to contact me with any questions you may have. Sincere, Philip D. Mann, E.I.T. Project Engineer