20150406115114436 (2).pdfPlan review Comments response #1
April 3, 2015
Plan Check #2015-0273
Dear Mr. Clugston, ACIP:
1. Please see revised plot plan showing all buffers and setbacks circled in red.
2. See attached revised report by John Altman.
3. See attached report by John Altman.
4. See revised plot plan under "Notes" lower left corner circled in red.
. See revised talcs circled in Red
6. Tennis court added and new calcs in Red
7. See enclosed Survey showing existing garage at 14.00' from property line.
See attached drawing showing a triangle with the base of the triangle at a scale of 4.00'
and a hypotenuse at about 4' 4". The garage addition is 4.00' that will leave the new
corner about 4-' 4." from the 10.00' setback.
Thank you very much.
Rob Michel
206•-930-2445
ti's