Loading...
20150407134320128.pdfApril 3, 2015 Mike Clugston, AICP Associate Planner City of Edmonds 1215th Avenue North Edmonds, WA 98020 Re: Former Woodway High School Multipurpose Sports Fields Files: BLD2014-1182 Dear Mr. Clugston, DA H ► AN As a follow up to your comments received from Chuck Miller, Plans Examiner as well as other modifications to the documents, please see the attached revised storm drainage technical report and revised drawings for the proposed improvements. A specific response is attached from LPD Engineering, relate to issues of the storm drainage system. On Sheet F0.0 — Cover Sheet: A series of drawings have been added, including F-2.7 — Site Details On Sheet F-1.4 and F -1.4A: Backflow Prevention devices are indicated for the irrigation/washwater service, as well as a new drinking fountain. On Sheet E-2.1: Specific requirements for pole foundation will be subject to a deferred submittal, should electrical improvements be awarded. They are currently indicated as an Additive Alternate Bid Item, and depending upon the contractors selected system specific structural design of poles and foundations will be forthcoming from a vendor, however signed by a licensed engineer. Subsequent submittal for approval for those specific elements should the alternate for lighting be awarded., Regards 4""* ��� Robert Harding, Principal D.A. Hogan & Associates, Inc. Cc: Matt Finch, Edmonds School District D.A. Hogan & Associates, Inc. (206) 285-0400 Tel 119 First Ave. S., Suite 110 (206) 285-0480 Fax Seattle, WA 98104