Loading...
2015-0461 ESD Woodway Elem renovation - Mahlum Arch.pdf City of Edmonds PLAN REVIEW COMMENTS BUILDING DIVISION (425) 771-0220 DATE: May 14, 2015 TO: Mahlum, Corrie Rosen crosen@mahlum.com FROM: Chuck Miller, Plans Examiner RE: Plan Check: BLD2015-0461 Project: ESD Woodway Elementary renovations th Project Address: 9521 240 Street SW During a review of the plans by the Building Division for the above noted project, it was found that the following information, clarifications, or changes are needed. A complete review cannot be performed until the revised plans/documents, including a written response indicating where the ‘clouded’ or otherwise highlighted changes can be found on the revised plans, have been submitted to a Permit Coordinator. Reviews by other divisions, such as Planning, Engineering, or Fire, may result in additional comments. On sheet A-112 – Floor Plans – Units A B C D E: 1.Detail D1 – Floor Plan – Unit E – Indicate on the plans the type of hardware to be used on door ‘E12A’ in space ‘E12A’ – Quiet Room. There does not appear to be any door hardware information (beyond keyed lockset information) on the ‘Door Schedule’ on sheet ‘A-113’. On sheet A-113 – Floor Plans – Units F, G, Toilet Plan and Door Schedule: 2.Detail A5 – Floor Plan – Unit G a.Clarify the indicated placement of the duct/louver penetration openings in the north wall of space ‘G308’ – Band - marked ‘11’. They do not appear to meet the 4 foot minimum separation requirement per referenced detail ‘A1/A-531’. b.Provide on the plans a detail, and a reference to it, for the required construction of the stairs, handrails, and guards (as applicable) in space ‘G310’ – Storage – meeting the requirements of International Building Code (IBC) sections 1009, 1012, and 1013 respectively. 3.Detail B1 – Enlarged Plan – Toilet F200A – Alternate 1 - Indicate on the plans the required width of the door and hardware meeting the requirements of International Code Council (ICC) A117.1-2009 section 404.2.2 and section 404.2.6.