2015-0518 Wartelle (Design Lines).pdf City of Edmonds PLAN REVIEW COMMENTS BUILDING DIVISION (425) 771-0220 DATE: May 21, 2015 TO: Dan and Alashia Wartelle alashia@wartellecommunications.com FROM: Andrew Gahan, Plans Examiner RE: Plan Check: BLD2015-0518 Project: Addition/Remodel th Project Address: 21423 95 Place West During a review of the plans by the Building Division for the above noted project, it was found that the following information, clarifications, or changes are needed. A complete review cannot be performed until the revised plans/documents, including a written response indicating where the ‘clouded’ or otherwise highlighted changes can be found on the revised plans, have been submitted to a Permit Coordinator. Reviews by other divisions, such as Planning, Engineering, or Fire, may result in additional comments. 1.Please provide the framing configuration of the existing portion of the roof. It appears from the elevation that the existing roof is stick framed with beams running front to back and rafters running side to side, potentially resulting in a point load on the new beam L-01. 2.Beam L-03 appears to be missing some loads. That beam appears to be supporting floor, low roof, wall and upper roof. 3.Beam L-04 should be reevaluated per the results of comment 2 above. 4.Joist L-06 appears to be missing a point load at the cantilevered end that would result from the wall/roof load above. In addition, the plans show a backspan of 8’ and the calculations show a backspan of 12’. Please revise. 5.It appears that a header is missing across the hallway in line with the existing exterior wall. Please advise.