Loading...
2015-0520 MGP Shell (Struct Only) by DB.pdfBeck & Associates, PLLC Structural Engineering & Code Consulting June 13, 2015 Leif Bjorback Building Official City of Edmonds 1215 th Avenue North Edmonds, WA 98020-3145 Subject: MGP Shell — (Structural Only Review) Permit: BLD2015-0520 Per your request, Beck & Associates has completed a structural only review of the drawings and calculations for conformance with the 2012 International Building Code (IBC), as adopted and amended by the State of Washington and the City of Edmonds. Our review of the plans and calculations indicates that corrections are necessary prior to permit issuance. The applicant should address the following comments in itemized letter format in addition to making corrections & revisions to the drawings. Geotechnical 1) The geotechnical engineer, GeoTest Services, Inc., is required to review the earthwork and foundation portions of the design drawings and specifications as indicated in their geotechnical report (p. 14 of 15, Job No. 14-0614, December 4, 2014). GeoTest Services should provide a letter summarizing their review. Any additional recommendations are required to be addressed in the drawings that are submitted in response to our review letter. General 2) Specify the required length of all embedded anchors, typ. 3) The plans (in various locations) make reference OWSJ and metal deck. However, OWSJ and metal deck are not used on this project. Please coordinate. I n+orni 4) An analysis was provided for anchorage of CMU walls to the wood diaphragm. However, a complete load path for these anchorage forces was not provided in accordance with ASCE 7- 10. Provide a complete analysis of subdiaphragms, continuous crossties, etc. for each principle direction. Reference ASCE 7-10 for all limitations and requirements. 52.2 — Roof Framing Plan 5) A'diamond' symbol with the number'6' is identified on the plans. However, this does not appear to be defined anywhere within the plan set. Please clarify what this means. 16425 SE 66th Street, Bellevue, WA 98006 • beckpllc@msn.com • PH: 206-313-3739 Permit 2015-0520 June 13, 2015 Page 2 of 2 6) 4/S8.2 is specified on the Roof Framing Plan. However, this detail is not applicable where it is called out. Please coordinate. S3.1— Sections 7) The sections all reference 3/S5.2. The reference should be to 3/S5.1. S5.1—Tvaical Concrete Details 8) Details reference 10/S7.1 for column base plate detailing. It appears the reference should be to 8/S7.1. S7.1—Tvaical Steel Details 9) Details 13 & 14/S7.1 are not applicable to this project. 10) Reference 8/S7.1. Update the Base Plate Schedule for the specifics of this project. 11) Reference 10/S7.1. Specify the required connector to the GLB (upside down hanger?). S8.1—Typical Wood Details 12) Numerous details on this sheet are not applicable to this project and should therefore should be removed from the plan set. S8.2 —Wood Details 13) 10 & 11/S8.1 are not applicable to this project. Alternate means of parapet bracing have been provided. Please contact me should you have any questions. Respectfully, Douglas Beck, PE, SE Beck & Associates, PLLC 16425 SE 66`h Street, Bellevue, WA 98006 . beckpllc@msn.com . PH: 206-313-3739