2015-0520 MGP Shell.pdf
City of Edmonds
PLAN REVIEW COMMENTS
BUILDING DIVISION
(425) 771-0220
DATE: June 26, 2015
TO: Glenn Goodman
Merlone Geier Partners
Email: ggoodman@merlonegeier.com
FROM: Leif Bjorback, Building Official
RE: Plan Check: BLD2015-0520
Project: MGP Shops Building Shell
Project Address: 21940 Highway 99
During review of the plans for the above noted project, it was found that the following information,
clarifications or changes are needed. Please provide written responses as to where the changes can be found
on the plans, and submit revised plans/documents to a permit coordinator in the Development Services
Department. Thank you.
1.Reference sheet A1.01, details 10 and 19: insulation Type 1 indicates batts in the exterior walls, yet
the exterior wall details show rigid (R13), which agrees with the envelope worksheet/ energy calcs.
Please coordinate.
2.Reference sheet A6.01: Change the glazing values in the General Notes to match those listed in
energy code form ENV-SUM for compliance performance approach, which are 0.40 for SHGC and
0.53 for U-factor.
3.Reference sheet M0.1: Provide outside air calculations for Tenant spaces 1 and 4, using IMC
Equation 4-1 and the OSA factors for restaurant use as listed in IMC Table 403.3. It appears the 300
CFM listed in the equipment schedule will fall significantly short of the minimum required for future
restaurant use.
4.Provide calculations and details from a Washington state licensed engineer for seismic anchorage of
rooftop mechanical units in excess of 400 lbs.
5.Please respond to the attached structural review comments from Beck and Associates.
6.Please complete and return the attached special inspection agreement forms. These may be returned
any time prior to permit issuance.