Loading...
20150522085949363.pdfApril 30, 2015 Ms. JoAnne Zulau City ofEdmonds 121 6mAvenue North Edmonds, VVA9802U Project: Edmonds SDWestgate Elementary Portables, Our File No. 2150007.13 Subject: Response to Comments dated April 23, 2015, Plan Check No. BLD20150376 Dear Ms. Zulauf: This letter is in dated April 23,8O15. regarding the above referenced project. The comments are included below(verbatim)for your reference. Our responses are shown inbold after each comment. The prescriptive sizing chart located in the CDEHandout E72Ashows that 33'of24" pipe is necessary for 3000 sf of impervious runoff. Please revise sizing on plans, Response: The project will create 3,167 sf of impervious surface. 24 If of 30 -inch diameter pipe is shown on the plan. Per the prescriptive sizing chart in COE Handout E72 A, this length and diameter of pipe meets the requirements for up to 3,500 sf of impervious surface. 2. The new connection bshown auaSTC879O. Will hbeable hoaccommodate three 8^ pipes entering a1the same elevation ontwo sides. Aoageneral rule the pipes should have aminimum ofG"between the outside diameter ofthe adjacent pipe. Knockout for an8'diameter pipe iagenerally b t12^indiameher. Please show that these separations can be attained or indicate that the catch basin will be replaced. Kyou have any questions, please call mea1(20G) 267-2425. Si /~~ —__— Grignon, P.E. Project Manger Doug Tapp, AHBL Steve Zang, Bassetti Architects me1s00om�cmwow_cxnm1o)wounm*<exourgo/ng\2m1o04o mpoww xvawuata